❑ OPERATION OF MOBILE HEAVY ❑Operators shall follow safe work practices for operation of heavy equipment: <br /> EQUIPMENT Only trained/qualified persons allowed to operate heavy equipment. <br /> Hazards: • Wear seat belts;roll-over protection system present/deployed;do not exceed maximum safe slope. <br /> Struck-by • No passengers on moving/operating equipment except where passenger seat/restraint is present. <br /> Run over,roll over • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms,windows clear. <br /> I - Caught between(pinch points) • Leaks or defective safety equipment should be repaired before use;fire extinguisher present. <br /> Fluid leaks/fuel-/fire-hazards • Maintain eye contact with ground personnel and use hand signals to direct their approach near equipment. <br /> Overhead hazards/obstructions • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes. <br /> Potential for body • Cease operation if personnel enter swing radius,travel path or hazard zone of moving parts,elevated loads. <br /> I entrapment/crushing • Use safe practices for fuel handling/storage/transport;spill equipment available for fuel/fluid leaks. <br /> ! - Rotating equipment,moving Equipment locked,secured,brakes set,buckets/forks lowered,extendable parts retracted,when not in use. <br /> parts. • Shut down/lock out equipment to prevent crush situation beneath or between moving parts of equipment. <br /> • Ensure personal/support vehicles are parked/located to not obstruct equipment travel lanes/operating zones. <br /> • Mark temporary roadways clearly,provide berms/stops where needed. <br /> HSE Program Documents:HSE SOP-644:Working Around Heavy Equipment <br /> TRENCHING/EXCAVATION ❑Safe work practices when personnel will enter trenches/excavations: <br /> Hazards: • Activities under supervision/oversight of Competent Person,conduct daily inspection of excavation. <br /> Cave-in,entrapment I • Excavated materials placed at least 2'from trench sidewall. <br /> Hazardous atmosphere i • Prevent water accumulation in trench. <br /> Water accumulation • Sloping&shoring for trenches/excavations>20'deep must be approved by a Professional Engineer. <br /> Falls into excavations • Sloping/shoring/trench box for excavations>5'when persons enter trench/excavation. <br /> Utility-related hazards <br /> Undermining structures& , • Sloping/shoring/trench box for shallow(<5')trench/excavation with cave-in hazard. <br /> foundations • Workers in trenches shall be within 25 feet of ladder or sloped entryway. <br /> • Excavations shall be protected by perimeter fencing(not barricade tape),if potential for personnel to fall into. <br /> i • If potential for atmospheric hazard,see D.12."Confined/Enclosed Spaces" <br /> HSE Program Documents:HSE SOP-432:Excavation and Trenching Activities <br /> FORKLIFT ®In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: i • Qualified operator,per established forklift training(certificate is required);Geosyntec operator must be <br /> Struck-by I approved by Director of Health and Safety. <br /> Run over/roll over/tip over • Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist. <br /> Overhead utilities/obstructions • Do not exceed lifting load limits. <br /> Caught between(pinch points) Forklift shall not be moved/driven with empty forks in raised position. <br /> Unstable/falling loads . When not in use,forks lowered,brake set,controls in neutral,key removed. <br /> Elevated forks <br /> Fluid leaks <br /> H5E Program Documents:HSE SOP-436:Safe Operation of Forklifts and Mobile Equipment <br /> AERIAL BOOM/SCISSOR LIFT ❑Follow safe work practices: <br /> Hazards: • Operators shall be appropriately trained and certified. <br /> Falls from basket ' • Equipment is inspected after mobilization and is in good condition. <br /> Overhead utilities/obstructions • Harness&lanyard worn when operating a boom lift(optional for scissor lift). <br /> Struck-by,run over,tip over • Overhead hazards and surface obstructions shall be reviewed with operators/riders prior to use. <br /> Caught between(pinch points) <br /> Tip over <br /> Fluid leaks. HSE Program Documents:HSE SOP-650:Manlifts and Aerial Lift Platforms(safe operation of mobile equipment) <br /> CRANES ( ❑In addition to general safety practices for Operation of Heavy Equipment(above),as applicable: <br /> Hazards: • Only qualified persons operate cranes(certificate required). <br /> - electrocution by overhead utility j • Critical Lift Plan&Checklist prepared/executed(See Procedure)prior to mobilization. <br /> - injury in swing radius • Equipment shall be inspected prior to mobilization and daily by crane operator. <br /> - injury from falling load I • Crane operator will remain at the controls at all times during operation. <br /> - crane tipping over due to I <br /> 1 i • Crane operation must be performed under the direction of an appointed signal person at all times using hand <br /> overbalancing,high winds, <br /> unstable ground,unsafe slope, signals and/or voice/radio communication. <br /> bad placement of outriggers I Crane shall be level and stable(solid ground or crane mats/timbers,outriggers if present,cribbing);over- <br /> injury from mechanical hazards reaching or exceeding load limits is prohibited. <br /> J I • Keep area beneath suspended loads clear of personnel;tag lines used to maneuver load. <br /> • Rigging procedures-see Mechanical Lifts with Rigging,below. <br /> i <br /> 1 <br /> ' MECHANICAL LIFTS WITH RIGGING ❑In addition to general safety practices for Operation of Heavy Equipment and Cranes(above),as applicable: <br /> Applies to lifting by rigging attached E • Slings,chains,rope,wire rope,as well as sheaves,boom and attachments used for lifting/hoisting shall be <br /> to crane,truck-mounted boom rig I maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> (e.g.drill rig),heavy equipment, ! • Coordinate lifting operations with competent person. <br /> mechanical/electrical hoist,similar • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. ; • Hooks will be equipped with safety latches. <br /> Hazards: . Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use. <br /> -Mechanical hazards, • Ensure personnel are not positioned beneath elevated loads and that tag lines are used where appropriate. <br /> -Elevated loads <br /> Irojellask R0712/Replacement of Monitoring Wells THA P <br /> Geosyntec° THA Date:6/6/2025 age 12 <br /> consultants <br />