Laserfiche WebLink
LOCKOUT/TAGOUT(LO/TO)OF I ❑Prepare site-specific written LO/TO program,and equipment-specific written LO/TO procedures(as <br /> HAZARDOUS ENERGY To prevent applicable);implement control procedures for hazardous energy sources,provide locks/tags,train workers, <br /> unplanned equipment start-up or designate"authorized"personnel,notify"affected"personnel. <br /> i release of energy when under <br /> maintenance/repair. <br /> HSE Program Documents:HSE STD-125:Personal Protective Equipment Program,HSE STD-135:Hearing Protection Program,HSE STD-150:Globally Harmonized <br /> System for Hazard Communication(for fuel),HSE SOP-460:Field Site Exposure Monitoring,HSE SOP-452o:Lock-out/Tag-out(North America-only),HSE SOP-454a: <br /> General Electrical Safety(US-only),HSE SOP-642:Powered Hand Tools;HSE SOP-654:Welding,Cutting and Other Hot Work <br /> D.7. DRILLING(Test Boring,Direct Push,Construction Drilling) ® Applicable ❑ Not Applicable,Not Anticipated <br /> Site-Specific Notes&Clarifications: <br /> A drill rig will be operated by PeneCore personnel to advance hollow stem augers to approx.25 ft bgs,with subsequent monitoring well installation. <br /> ® i DRILLING&DIRECT PUSH i <br /> Includes hazards posed by drilling rig 3 ®Follow safe work practices,as applicable: <br /> and associated equipment,heavy i • Non-drilling personnel shall stay clear of drilling work zone when drill rig in operation. <br /> I support vehicles,trailer/towing • Equipment shall be maintained in good repair,inspected daily upon mobilization;backup alarms and <br /> E hazards,and similar mobile emergency stop operational,machine guards in place,whip checks on high pressure lines. <br /> equipment. ! • Leaks or defective safety equipment will be repaired before use. <br /> i • Establish eye contact with operator and use hand signals prior to approaching the rig. <br /> Hazards: • Use PPE near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent). <br /> Struck-by equipment j • Arrange personal/support vehicles to protect drill team and not obstruct travel lanes or other operations. <br /> ` - Run over,roll-over ! • Operators/helpers must maintain safe distance from moving parts;secure loose hair/clothing,equipment. <br /> I - Caught between(pinch points) • Drill rigs will only be moved with masts lowered. <br /> Manual lifting,musculoskeletal • Maximum safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed. <br /> - Fuel/fluid leaks,fuel hazards • Use safe practices for fuel handling/storage/transport;spill equipment available for fuel/fluid leaks. <br /> - Suspended equipment j • Ventilate exhaust and conduct air monitoring,as appropriate,when drilling indoors. <br /> j - Roadway hazards. • Never climb drill mast without appropriate fall protection. <br /> i <br /> • Use precautions for overhead and underground utilities <br /> ' MECHANICAL LIFTING,RIGGING ❑In addition to general drilling&direct push safety practices(above),as applicable: <br /> Applies to lifting truck-mounted boom . Slings,chains,rope,wire rope,as well as sheaves,boom,and attachments used for lifting/hoisting shall be <br /> rig(e.g.,drill rig),and all other drilling- maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> related mechanical/electrical hoist . Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. . Hooks will be equipped with safety latches. <br /> 1 Hazards: I • Ensure anchor points for winch or other lift device are engineered for intended use. <br /> - Mechanical hazards • Ensure personnel are not positioned beneath elevated loads. <br /> Elevated loads { <br /> WARNING) Confirmed or possible j ❑Follow safe work practices per D.11."Utility-Related Hazards." <br /> close proximity to OVERHEAD or <br /> UNDERGROUND UTILITIES. <br /> HSE Program Documents:HSE SOP-430:Drilling Activities,SOP-434a:Overhead and Underground Utility Hazards(US-only), <br /> HSE SOP-644:Working Around Heavy Equipment, <br /> D.8. CONSTRUCTION, HEAVY EQUIPMENT, LIFT EQUIPMENT ®Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Drill and development rig movement from location to location. <br /> ® WORKING NEAR MOBILE HEAVY ®For personnel on-foot/on-the-ground near operating heavy equipment,follow safe work practices: <br /> EQUIPMENT,ON-SITE VEHICLES • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes. <br /> Hazards: • Maintain unobstructed vision:wear shaded eyewear only in bright sun;don't wear hoods. <br /> Struck-by I • Erect barriers and post signs to identify and isolate the equipment hazard zone,if possible. <br /> Caught between . Stay out of swing radius of equipment,both in front and operating end,as well as at the back of equipment. <br /> - Run over,roll over • Stay out of the travel path of operating heavy equipment. <br /> j Overhead hazards/obstructions i • When crossing vehicle pathway behind moving equipment,cross at a distance not less than 30 feet. <br /> I - Elevated loads ( • When approaching equipment,always be able to see operator so he/she can see you. <br /> i • Make eye contact with operator and use hand signals or make radio contact prior to approaching equipment. <br /> I • Operator shall provide"all off'hand signal when it is safe to approach within swing radius of equipment. <br /> Project/Task Name:TR0712/Replacement of Monitoring Wells THA ver.4.0 <br /> Geosynte& THA Date:6/26/2025 Page 11 <br /> consultants <br />