LOCKOUT/TAGOUT(LO/TO)OF I ❑Prepare site-specific written LO/TO program,and equipment-specific written LO/TO procedures(as
<br /> HAZARDOUS ENERGY To prevent applicable);implement control procedures for hazardous energy sources,provide locks/tags,train workers,
<br /> unplanned equipment start-up or designate"authorized"personnel,notify"affected"personnel.
<br /> i release of energy when under
<br /> maintenance/repair.
<br /> HSE Program Documents:HSE STD-125:Personal Protective Equipment Program,HSE STD-135:Hearing Protection Program,HSE STD-150:Globally Harmonized
<br /> System for Hazard Communication(for fuel),HSE SOP-460:Field Site Exposure Monitoring,HSE SOP-452o:Lock-out/Tag-out(North America-only),HSE SOP-454a:
<br /> General Electrical Safety(US-only),HSE SOP-642:Powered Hand Tools;HSE SOP-654:Welding,Cutting and Other Hot Work
<br /> D.7. DRILLING(Test Boring,Direct Push,Construction Drilling) ® Applicable ❑ Not Applicable,Not Anticipated
<br /> Site-Specific Notes&Clarifications:
<br /> A drill rig will be operated by PeneCore personnel to advance hollow stem augers to approx.25 ft bgs,with subsequent monitoring well installation.
<br /> ® i DRILLING&DIRECT PUSH i
<br /> Includes hazards posed by drilling rig 3 ®Follow safe work practices,as applicable:
<br /> and associated equipment,heavy i • Non-drilling personnel shall stay clear of drilling work zone when drill rig in operation.
<br /> I support vehicles,trailer/towing • Equipment shall be maintained in good repair,inspected daily upon mobilization;backup alarms and
<br /> E hazards,and similar mobile emergency stop operational,machine guards in place,whip checks on high pressure lines.
<br /> equipment. ! • Leaks or defective safety equipment will be repaired before use.
<br /> i • Establish eye contact with operator and use hand signals prior to approaching the rig.
<br /> Hazards: • Use PPE near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent).
<br /> Struck-by equipment j • Arrange personal/support vehicles to protect drill team and not obstruct travel lanes or other operations.
<br /> ` - Run over,roll-over ! • Operators/helpers must maintain safe distance from moving parts;secure loose hair/clothing,equipment.
<br /> I - Caught between(pinch points) • Drill rigs will only be moved with masts lowered.
<br /> Manual lifting,musculoskeletal • Maximum safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed.
<br /> - Fuel/fluid leaks,fuel hazards • Use safe practices for fuel handling/storage/transport;spill equipment available for fuel/fluid leaks.
<br /> - Suspended equipment j • Ventilate exhaust and conduct air monitoring,as appropriate,when drilling indoors.
<br /> j - Roadway hazards. • Never climb drill mast without appropriate fall protection.
<br /> i
<br /> • Use precautions for overhead and underground utilities
<br /> ' MECHANICAL LIFTING,RIGGING ❑In addition to general drilling&direct push safety practices(above),as applicable:
<br /> Applies to lifting truck-mounted boom . Slings,chains,rope,wire rope,as well as sheaves,boom,and attachments used for lifting/hoisting shall be
<br /> rig(e.g.,drill rig),and all other drilling- maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage.
<br /> related mechanical/electrical hoist . Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart.
<br /> equipment. . Hooks will be equipped with safety latches.
<br /> 1 Hazards: I • Ensure anchor points for winch or other lift device are engineered for intended use.
<br /> - Mechanical hazards • Ensure personnel are not positioned beneath elevated loads.
<br /> Elevated loads {
<br /> WARNING) Confirmed or possible j ❑Follow safe work practices per D.11."Utility-Related Hazards."
<br /> close proximity to OVERHEAD or
<br /> UNDERGROUND UTILITIES.
<br /> HSE Program Documents:HSE SOP-430:Drilling Activities,SOP-434a:Overhead and Underground Utility Hazards(US-only),
<br /> HSE SOP-644:Working Around Heavy Equipment,
<br /> D.8. CONSTRUCTION, HEAVY EQUIPMENT, LIFT EQUIPMENT ®Applicable ❑ Not Applicable, Not Anticipated
<br /> Site-Specific Notes&Clarifications: Drill and development rig movement from location to location.
<br /> ® WORKING NEAR MOBILE HEAVY ®For personnel on-foot/on-the-ground near operating heavy equipment,follow safe work practices:
<br /> EQUIPMENT,ON-SITE VEHICLES • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes.
<br /> Hazards: • Maintain unobstructed vision:wear shaded eyewear only in bright sun;don't wear hoods.
<br /> Struck-by I • Erect barriers and post signs to identify and isolate the equipment hazard zone,if possible.
<br /> Caught between . Stay out of swing radius of equipment,both in front and operating end,as well as at the back of equipment.
<br /> - Run over,roll over • Stay out of the travel path of operating heavy equipment.
<br /> j Overhead hazards/obstructions i • When crossing vehicle pathway behind moving equipment,cross at a distance not less than 30 feet.
<br /> I - Elevated loads ( • When approaching equipment,always be able to see operator so he/she can see you.
<br /> i • Make eye contact with operator and use hand signals or make radio contact prior to approaching equipment.
<br /> I • Operator shall provide"all off'hand signal when it is safe to approach within swing radius of equipment.
<br /> Project/Task Name:TR0712/Replacement of Monitoring Wells THA ver.4.0
<br /> Geosynte& THA Date:6/26/2025 Page 11