Laserfiche WebLink
Geosyntec O <br /> consultants <br /> 4. SCHEDULE <br /> Geosyntec desires to collect the soil samples on August 27, 2024, concurrent with the routine <br /> Q3-2024 semiannual groundwater monitoring event already scheduled for the site. <br /> 5. SAFETY PLAN FOR COLLECTION OF SOIL SAMPLES <br /> Geosyntec has prepared a health and safety plan in the form of a Task Hazard Analysis(THA) <br /> for the collection of shallow soil samples. The THA can be found in Appendix B. <br /> 6. REFERENCES <br /> All reports referenced above may be found on the RWQCB's GeoTracker site at this address: <br /> http://aeotracker.waterboards.ca.aov/profile report? lg obal_id=SL205763037 <br /> 2024 TR0712 Stockton Soil Sampling Work Plan 4 2024.08.2 <br />