Laserfiche WebLink
INSTRUCTIONS FOR THIS SECTION: THIS INSTRUCTION SHOULD ALWAYS BE <br /> 1. List/describe"TASKSIWORK ASPECTS"in Column 1,below. "COLLAPSED"IN COMPLETED THAI <br /> 2. List/describe associated"HAZARDSIRISKS"in Column 2,below. (particularly in printed versions) <br /> 3. Under"CONTROLS"in Column 3: <br /> • At a minimum: Insert applicable SECTION REFERENCES* (numbers and heading)referring to corresponding sections in Parts C,D and E <br /> where site-specific aspects are fully described by checking appropriate checkboxes and adding"Site-Specific Notes&Clarifications." <br /> • 0 tp ional:Add additional site-specific keywords and phrases in Column 3 to clarify control strategy(s)for the associated hazard(s). <br /> *SECTION REFERENCES-COPY AND PASTE,as applicable,under 1.CONTROLS" <br /> See C.2.SAFETY EQUIPMENT LIST See D.11.UTILITY-RELATED HAZARDS <br /> See D.1.ROUTINE HAZARD PREPAREDNESS See D.12.CONFINED/ENCLOSED SPACES <br /> See D.2.SPECIAL DRIVING/TRAFFIC/TRANSPORTATION HAZARDS See D.13.INFECTIOUS/ALLERGENIC BIOHAZARDS <br /> See D.3.WATER HAZARDS See D.14.COMMERCIAL CHEMICAL PRODUCTS <br /> See DA.FALL HAZARDS See D.15.SITE CONTAMINANTS,CHEMICAL WASTES <br /> See D.5.HAND TOOLS See DA 6.RADIATION HAZARDS(Other than Sunlight) <br /> See D.6.POWERED TOOLS&EQUIPMENT See D.17.HAZMAT/DANGEROUS GOODS SHIPPING/TRANSPORTATION <br /> See D.7.DRILLING See E.1.AIR MONITORING <br /> See D.8.CONSTRUCTION,HEAVY EQUIPMENT,LIFT EQUIPMENT See E.2.OTHER WORKER EXPOSURE MONITORING <br /> See D.9.STORAGE OF BULK MATERIALS See E.3.FENCELINERERIMETER AIR MONITORING <br /> See D.10.ELECTRICAL WORK TASKS <br /> 1.TASKS/WORK ASPECTS 2. HAZARDS/RISKS 3. CONTROLS <br /> • Use routine safe/defensive driving practices(seat belts,safe <br /> speeds,eyes ahead, no tailgating,limit distractions,safe cell <br /> phone use,no texting,clear windows,account for <br /> weather/road conditions,adequate sleep,other measures as <br /> Mobilization/Demobilization Routine work travel appropriate). <br /> • Plan travel route before driving(assemble maps,enter <br /> destination in GPS). <br /> • Check 360 degrees around the vehicle. <br /> • All workers have"Stop Work"authority <br /> Oversight of subcontractors during Slip/trip/fall hazards,vehicle traffic, • High visibility safety vests,hard hats,and steel-toe boots <br /> soil sampling activities,GPS warm weather/heat stress 0 Walk the site to evaluate work areas and designate routes of <br /> location of each soil sample travel and keep walkways clear of obstructions <br /> collection point prior to sample 0 Pay careful attention to work environment to identify hazards <br /> collection activities,mobilization (e.g.water, irrigation lines,debris) <br /> from location to location in the 0 Wear steel toed shoes with adequate grip for environmental <br /> plantation. conditions <br /> • Be aware of old irrigation lines in plantation and avoid walking <br /> over them <br /> • Good housekeeping practices in work areas <br /> • Be prepared for warm weather conditions,complete <br /> Geosyntec's Heat Stress Tool prior to beginning work to <br /> determine heat stress risk level <br /> • Drink fluids through the day,wear sunscreen,take breaks as <br /> needed and be aware of signs of overheating/heat illness <br /> • All workers have"Stop Work"authority <br /> Borehole advancement using hand • Slip/trip/fall hazard,wet surfaces, Good housekeeping <br /> auger and soil sample collection. dust from drilling,flying 0 Be aware of old irrigation lines in plantation and avoid walking <br /> debris/projectiles(rocks),pinch- over them <br /> points,subsurface utilities,warm 0 Clear area with USA811 prior to start of work <br /> weather/heat stress, 0 Appropriate PPE(high-visibility vest,steel-toed boots with <br /> ergonomics/awkward positions grip,gloves,eye and hearing protection) <br /> • Conduct coring in well ventilated spaces where possible <br /> • Use wet methods for coring to minimize dust <br /> • Hand auger the boring only in approved location,cleared of <br /> underground utilities <br /> • Communication with site supervisors <br /> • Avoid pinch-points <br /> • Be aware of"line of fire"injury potential <br /> • Be prepared for warm weather conditions <br /> • Drink fluids through the day,wear sunscreen,take breaks as <br /> needed and be aware of signs of overheating/heat illness <br /> • Use proper ergonomic positions when operating hand auger <br /> or lifting equipment.Lift with legs and not with back,get help <br /> for loads greater than 50 pounds or use equipment to lift <br /> • All workers have"Stop Work"authority <br /> Geosyntec° Project/Task Name:TR0712/GSH OxyChe j-Stockton Routine Soil Sampling <br /> THA Date:07/25/2022 Updated 8-15-2024 <br /> Consultants Page 2 <br />