3M02 ASTM D2310Classcations (at73.4°F) <br />PrimaryPipe <br />SecondaryPipe <br />2"-3" RTRP-11AF <br />3" RTRP-11AF <br />4" RTRP-11AH <br />4"-6" RTRP-11AH <br />(Mechanical properties cell classifications shown are minimums.) <br />3.03 Fittings-Allfittingsshallbe manufactured usingthesametype <br />of material as the pipe. Fittings maybe manufactured eitherby <br />compression molding, filamentwinding, resin transfer molding <br />orcontact molding methods. All fittings, adapter, and sump <br />penetrations shall be UL971-2004 Listed. <br />Primaryfittingsshall beadhesive bonded, matched tapered bell <br />and spigot and rated the same as the pipe. <br />Secondary containmentfittings shall betwo-piece styleto allow <br />r100% inspection of the primaryjoint pressure test and be rated <br />toa minimum of 50 psigper UL971-2004. <br />Should hydrostatictesting be impractical,testingwith low <br />pressureairorinert gas may Deacceptable. Extremecaution <br />shouldbeused when testingwithair, Follow all safety precautions <br />and testing recommendations of the pipe manufacturer. <br />3.04 <br />Connections -Connections to flex connectors or other piping <br />materiasslhall be made bythe use of NPT (National Pipe Thread) <br />threaded adapters orflanges bonded to the FRP piping system, <br />3.055umpPenetrations -Sump penetrations shall <br />bemadebymeans <br />ofa permanentlybonded FRP coupling. Thecouplingshallbe <br />capable of adjusting forthe slope of the piping system entering or <br />exitingthesump wall. <br />3.06 Adhesives -Adhesives shalt be manufacturer's standard forthe <br />pipingsystem specified. <br />3.07 Acceptable Products <br />- Red Thread IIA pipingsystem as <br />manufactured by FiberGlass Systems orengineered approved <br />equal. <br />National Oilwell Varco has produced this brochure forgeneral <br />informat(on only, and it Is not intended for design purposes. Although <br />everyeffort has been made to ma(ntaln the accuracy and rellabllity of <br />its contents, National Oilwell Varco in no way assumes responsibility <br />for liability for any loss, damage or injury resulting from the use of <br />information and data herein nor is any warranty expressed or implied. <br />Always cross-reference the bulletin date with the most current version <br />listed at the web site noted in this literature. <br />n 2018 National Oilwell Varco All rights reserved <br />CI1201ENG October 2018 <br />Section 4 - Installation and Testing <br />4.01 Training and Certification -Alljoints installed orconstructed <br />in the field shall be assembled by employees of the contractor <br />who have been trained bythe pipe manufacturer. The pipe <br />manufacturerortheir authorized representative, shall train the <br />contractor's employees in the properjoining and assembling <br />procedures required forthe project, including hands-on <br />participation by the contractor's employees. Each bondershall <br />fabricate one pipe -to -pipe and one pipe-to-fittingjointthatshall <br />passthe minimum pressure test forthe application asstated in <br />Section 2.03 without leaking. <br />only bonders that have successfully completed the pressure test <br />shall bond pipe and fittings. Each bonder shall carry a current, <br />manufacturer proof oftrainingcard. <br />4.02 Pipe Installation -Pipe shall be installed as specified and <br />indicated on the drawings. <br />The piping system shall be installed in accordance with the <br />manufacturer's current published installation procedures. <br />4.03 Testing -A hydrostatic pressure testshall be conducted on the <br />completed piping SYS tem. The piping system shall be subjected <br />to 10 pressurization cycles from 0 psigto 1.5timesthe design <br />operating pressure as stated in Section 2.03.c. After the 10 cycles, <br />the pressureshall be held on thesystem fora minimum of 1 hour <br />and the line inspected for leaks. <br />Test pressures shall notexceed 1.5 times the <br />maximum rated <br />pressure of the lowest rated element in the system. <br />All pipejointsshall be watertight, Alljoints that are found to <br />leakI byobservation orduringtestingshall be replaced bythe <br />contractorand retested. <br />Should hydrostatictesting be impractical, testingwith low <br />pressureairorinertgasmaybeacceptable. Extremecaution <br />should be used when testingwith air. Follow all safety precautions <br />and testing recommendations of the pipe manufacturer. <br />Fiber Glass Systems <br />17115 San Pedro Avenue, Ste 200 <br />San Antonio, Texas 78232 USA <br />Phone: 210 477 7500 <br />Fax: 210 477 7560 <br />Fiber Glass Systems I KAY P oduc[ionnSolu[ions fgspipe@nov.com <br />nov.com/fgs <br />