Laserfiche WebLink
Red ThreadT`" IIA, DualoyTM 3000/L&3000/LCX Installation Checklist R <br /> lull <br /> HANDLING <br /> General <br /> Red Thread I Dualoy3000/L&3000/LCX UL/ULC Listed primary and secondary pipingsystems are rated to <br /> thefollowing maximum operating ratings: <br /> Primary:2"@ 250 psig;3"@ 175 psig;4"@ 125 psig Secondary:3"-4"@ 50 psig;6"@ 20 psig <br /> Owner/Operator(please print&sign name) <br /> Owner&Store No. Aeco T14oarVTot4 JobSiteAddress 90310 TRovsToM Rp STOC.ICTOIJ CA <br /> Ownersite Representative Signature _-5� <br /> Installation CompanyandAddress ToWAI CouWTQy CoNTaAC7-o2S 3z0b LLAYu.NGI Dfk.?_ANCHo CokDo\/A 45�� <br /> Installation Foreman AR IEL [3i9f "A)TF5 Signature <br /> Installation Date(s) I 7,/3 2-4 SECOND, tV 121`I zy <br /> Review the Important Notice Section on page 2 before completing <br /> Pre-Installation Checklist(indicate date verified after each item) Installer's Foreman Owner/Operator Rep. <br /> Installer shall show evidence that: l Z Z I ZY <br /> 1. He/She is licensed or certified by the state implementing agency(where applicable). <br /> 2. Each bonder on site is current in his/her manufacturer's training(recommended every 3years). <br /> Installer has current manufacturer's installation instructions: <br /> Installation manualnumber�n�cq� Manual Dated AOfll�-- <br /> Pipe&fittings have UL(Underwriters'Laboratories)or ULC(Canada)label.NOTE:label may be located on t boxforre /^ <br /> fittings. /Z L Z 7 �/ v <br /> Proper tools and adhesive are on-site per manufacturer's recommendations. '-2i Z 'Zy <br /> Pipe&Fittings inspection: <br /> 1. Impactor puncture....Cutout.See Footnote 1 for repairs. <br /> 2. DamageCheckb bonding <br /> surfacoff rultrand taper. 1 _/ <br /> 3.Check bonding surfaces for ultraviolet weathering degradation. <br /> 4. Replace any missing pipe end caps to protect tapers until time to install. <br /> Trench: <br /> Allow <br /> 1. Have <br /> quire mu slope <br /> pero owner's <br /> design do I Z4 Z-/ C� <br /> 2. Have required slope perowner's design documents or local requirement. ( I <br /> 3.Width:Allow for 4"minimum separation between pipes and 6"minimum from trench walls. <br /> Approved backfill(NO native soil): <br /> 1. Provide backfill per owner's design documents;orat a minimum: <br /> 2.Clean washed sand,or I-,7I l 1" 1 <br /> 3. Pea gravel-1/8"to 3/4"particle size,or <br /> 4. Refer to Footnote 1 for other backf ill materials. <br /> Installation Procedures(Indicate date verified after each item) <br /> 1.6"of approved bedding material. I�� / / <br /> 2. Dry fit system priorto adhesive bonding.See Footnote 1. 7(/ , <br /> 3. Heat assist required for adhesive curing when temperature is below507(10°C).See Footnote 1. <br /> 4.A minimum separation of 4"between pipe runs and 21/2'on crossovers. /� ^ <br /> 5. Bedding/backfill supports pipe completely on runs and crossovers. v v <br /> 6. Minimum of 6"approved backfill cover material or more as required by local authorities or design documents. <br /> 7. If surface is unpaved,a minimum of 18"of approved backfill(for2"pipe)is required.See Footnote 1. <br /> Inspection and Testing(Indicate date verified after each item) <br /> 1.Joint Back <br /> joints(misaligned Footnote <br /> tapers).See Footnote 2. r�/O' <br /> 2.Joint Back off,See Footnote 2. 1 <br /> 3.Check for proper cure of adhesive bond.See Adhesive Kit instructions. <br /> 4.Test piping system in accordance with manufacturer's recommendations or local requirements,See Footnote 3. <br /> 5.Secondary containment piping,See Footnote 1. <br /> See Footnotes on following page <br /> Fiber Glass Systems I KEY P oductionSolutions <br />