My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 10:51:56 AM
Creation date
8/28/2025 4:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Installation Checklist <br /> For Fiberglass Underground Tanks <br /> The tank installation checklist,these instructions,and any correspondence related to the tank installation must be <br /> retained by tank owner.This checklist will be required and must be provided to CSI when making as warranty claim. <br /> Site Owner P 'A 2ef Date of Installation Qc— L 6y- 2—3,2W Zq <br /> SliteAddress ` 03(o 1 korrcKrt pc) 5+bcG hin <br /> Street City State Zip <br /> � Cd> f► hx(s 32 0(, L"uu" Dr Installing Contractor lowh a►,,) C >Jvt � L vlc.ko 6�)DVlx Ca q Z <br /> Company Street City State Zip <br /> Completed NIA <br /> 1. Installation backfill material meets CSI specification(sieve analysis is attached). <br /> Indicate which material you used: Pea Gravel J <br /> ❑ Crushed Stone <br /> ❑ Other(CSI approval letter attached) <br /> 2. Backfill above tank top. <br /> Indicate which material you used: $L Same backfill material as#1 above <br /> ❑ Geotextile and alternative material above tank top <br /> 3. Excavation and tank clearance meet requirements of Section 6. <br /> 4. Geotextile used to line excavation: 9—Yes ❑ No � <br /> S. Indicate hole condition: <br /> tt-Dry hole(Water is not anticipated to reach tank-area is not subject to flooding) <br /> ❑ Wet hole(Excavation may trap water-area is subject to flooding) <br /> 6. Anchoring performed in accordance with installation instructions:_ <br /> Indicate which method you used 14--Deadmen <br /> ❑ Anchor Pad <br /> ❑ No mechanical anchoring <br /> 7. Depth of backfill under tank 12 inches <br /> 8. All deflection measurements are recorded on reverse side. - <br /> 9. Backfiil placed in 12"lifts&probed as described in Section 11. —� <br /> 10. Tanks ballasted according to Section 10. _ <br /> 11. Tank burial depth complies with the requirements of Section 8. <br /> 12. Piping and bottom sump clearances according to Section 13. <br /> 13. All piping connections are flexible connections according to Section 13. <br /> Installation was in accordance with Tank Installation Instructions(INST.60,011)). J f ' J q •�,J <br /> L AU►'\ 4. 114A a- XhJ LGtr Iola? <br /> Owner Representative(Print Name)(/ Date Contractor Representativ (PrintName) Date <br /> oot��,� )J, 9,w t Y <br /> fwm"er Repr ative(Sig t re) Date ontrac res ative(Signat Date <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.