Laserfiche WebLink
SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />REVISIONS: <br />18-046 12-24-2020 <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />PROFESSIONAL SEALS: <br />1014 S. Airport Road <br />Manteca, California <br /> 95336 <br />1 <br />2 <br />Robinson Oil Corporation <br />955 Martin Ave. <br />Santa Clara, CA 95050 <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />K12 Architects, Inc <br />CONVENIENCE STORE & <br />FUELING CANOPY <br />MANTECA <br />3 <br />4 <br />PLAN CHECK JAN. 12, 2023 <br />OWNER CHANGE MARCH 17, 2023 <br />PLAN CHECK AUGUST 17, 2023 <br />PLAN CHECK MARCH 29, 2024 <br />PLAN CHECK hzmt MAY 10, 2024 <br />5 PLAN CHECK hzmt MAY 31, 2024 <br />6 PLAN CHECK hzmt AUGUST 7, 2024 <br /> November 06, 2024 <br />8 PLAN CHECK hzmt OCT. 26, 2024 <br />7 PLAN CHECK hzmt SEPT. 26, 2024 <br />87 & 91 <br />FS4.1 <br />TANK SUMPS <br />719 <br />20 <br />6 91 GAS FILL DETAIL <br />FIBERGLASS CONTAINMENT <br />SUMP TO TANK COLLAR <br />INSIDE AND OUT TO INSURE <br />WATER TIGHTNESS <br />7 <br />42" MULTIPORT MANHOLE <br />W/ LIQUID TIGHT & VAPOR <br />TIGHT FILL BOX <br />5 GALLON FILL AND <br />VENT BUCKETS <br />JUNCTION BOX (EXPLOSION <br />PROOF) <br />1" CONDUIT TO TURBINE <br />SUMP JUNCTION BOX <br />4. <br />1. <br />2. <br />3. <br />USE OPW RISER SUPPORT BRACKETS (BRACELETS) <br />NOTES: <br />STEEL PLATE AT <br />TANK BOTTOM <br />4" ALUMINUM FILL TUBE w/ <br />POSITIVE SHUT OFF DEVICE: <br />INSTALL AT 95% OF TANK <br />CAPACITY <br />17 <br />9 <br />10 <br />12 <br />11 <br />VAPOR BUCKET WITH NO <br />DRAIN <br />14 FACE SEAL ADAPTER <br />90 <br />INSTALL DOUBLE WALLED <br />FIBERGLASS CONTAINMENT <br />SUMP TO AB2481 STANDARD <br />PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS <br />PREFERRED. 15° MAXIMUM ALLOWABLE PENETRATION <br />ANGLE. <br />USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS <br />OF SUMP. <br />ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 1'-0" OF THE <br />TOP OF SUMP. <br />4" FILL CAP <br />FUEL SWIVEL ADAPTOR4" VAPOR CAP <br />VAPOR SWIVEL ADAPTOR <br />SUMP PENETRATION BOOT50 <br />4 <br />4 <br />91 <br />BRINE INTERSTITIAL <br />MONITORING <br />4"Ø SCH. 40 <br />GALVANIZED RISER <br />PRIMED AND WRAPPED <br />2"43°45° <br /> MAX <br />.5 1/2"6" MAX.82SEE DETAIL <br />18/FS5.0 <br />82 <br />SCALE:3/4" = 1'-0" <br />91GAS TURBINE SUMP PLAN VIEW <br />3" OVER 2" FRP VENT LINE TO VENT <br />RISER - ZONE 5 <br />3" OVER 2" FRP PRODUCT, <br />TO DISPENSERS - ZONE 4 <br />SUMP SENSOR SEE <br />DETAIL 18 / FS5.0 <br />2" BALL VALVE (MAKE HANDLE <br />ACCESSIBLE FROM GRADE) <br />30 <br />38 <br />91 <br />98 <br />98 <br />3x2 SMITH FIBERGLASS BONDED <br />ENTRY FITTING <br />EXTEND TO <br />VACUUM <br />SENSOR <br />4"Ø SCHED. 40 PUMP RISER <br />4" OVER 3" FRP VAPOR RETURN <br />LINE - VAPOR ZONE 2 <br />LINE OF VACUUM <br />SENSOR ABOVE <br />LINE OF TURBINE PUMP ABOVE <br />DOUBLE WALL CONDUIT ENTRY <br />CUFF, TYPICAL <br />98 <br />EXTEND TO <br />VACUUM <br />SENSOR <br />EXTEND TO <br />VACUUM <br />SENSOR <br />DOUBLE WALL <br />CONTAINMENT SUMP 5 <br />82 <br />4x3 SMITH FIBERGLASS <br />BONDED ENTRY FITTING 49 <br />48 <br />1" CONDUIT FOR PUMP POWER TO <br />ELECT. PANEL, ONE PER TANK <br />WEATHERPROOF JUNCTION BOX, TYP. <br />MAG PROBE ASSEMBLY7480 <br />RIGID CONDUIT TO TLM <br />TANK MANWAY COVER <br />EXTRACTOR FITTING, SEE DETAIL <br />8/FS3.1 FOR FRP CONNECTIONS21 <br />3x2 SMITH FIBERGLASS <br />BONDED ENTRY FITTING 48 <br />SCALE:3/4" = 1'-0" <br />91 GAS TURBINE CONTAINMENT - VIEW ELEVATION <br />2HP VARIABLE <br />SPEED PUMP JUNCTION BOX <br />(EXPLOSION PROOF) <br />DW CONTAINMENT SUMP <br />42" WATERTIGHT <br />MANHOLE <br />28 <br />5 <br />82 <br />91 <br />BRINE SUMP INTERSTITIAL <br />MONITORING <br />30 <br />SUMP TEST PORT, BEYOND <br />TANK LEVEL MONITOR74 <br />3" OVER 2" FRP PRODUCT <br />PIPING - ZONE 4 <br />VACUUM SENSOR 84 <br />2" BALL VALVE 38 <br />4" EVR APPROVED CAP80 <br />2" x 12" FLEX CONNECTOR37 <br />TO VAPOR & VENT PIPING, <br />SEE DETAIL 8 / FS3.1 <br />DOUBLE WALL ELECTRICAL <br />CONDUIT ENTRY CUFF, TYP <br />EXTRACTOR, SEE DETAIL <br />8 / FS3.1 FOR VAPOR AND <br />VENT CONNECTIONS <br />98 <br />48 <br />RIGID INSULATION AT SUMP <br />COLLAR, TYP <br />82SEE DETAIL 18/FS5.0 <br />90 <br />3x2 SMITH FIBERGLASS <br />BONDED ENTRY FITTING <br />SCALE:3/4" = 1'-0" <br />91 GAS FILL - PLAN VIEW <br />EXTEND TO <br />SUMP SENSOR <br />ABOVE <br />VAPOR FILL <br />82 91 <br />SU <br />M <br />P <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br />AB <br />O <br />V <br />E <br />DOUBLE WALL RIGID <br />CONDUIT ENTRY CUFF, <br />TYPICAL <br />42"Ø DW CONTAINMENT <br />SUMP WITH REDUCING <br />LID <br />50 <br />4 <br />LINE OF 5 GALLON FILL <br />BUCKET ABOVE <br />DROP FILL TUBE17 <br />WEATHERPROOF <br />JUNCTION BOX <br />RIGID CONDUIT, TYPICAL <br />SUMP HYDROSTATIC <br />MONITOR ABOVE90 <br />4"Ø SCHEDULE 40 RISER, <br />TYPICAL <br />SEE <br />DETAIL <br />18/FS5.0 <br />8 <br />10 <br />9 <br />SCALE:3/4" = 1'-0" <br />87 FILL SUMP - PLAN VIEW <br />DOUBLE WALL RIGID <br />CONDUIT ENTRY CUFF, <br />TYPICAL <br />42"Ø DW CONTAINMENT <br />SUMP WITH REDUCING <br />LID <br />50 <br />4 <br />EXTEND TO <br />SUMP SENSOR <br />ABOVE <br />VAPOR FILL <br />LINE OF 5 GALLON FILL <br />BUCKET ABOVE <br />82 91 <br />DROP FILL TUBE17 <br />WEATHERPROOF <br />JUNCTION BOX <br />RIGID CONDUIT, TYPICAL <br />SU <br />M <br />P <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br />AB <br />O <br />V <br />E <br />SUMP HYDROSTATIC <br />MONITOR ABOVE90 <br />4"Ø SCHEDULE 40 RISER, <br />TYPICAL <br />SEE <br />DETAIL <br />18/FS5.0 <br />DETAILS <br />SCALE:3/4" = 1'-0" <br />87 GAS FILL SUMP: FILL, VAPOR DETAIL <br />FIBERGLASS CONTAINMENT <br />SUMP TO TANK COLLAR <br />INSIDE AND OUT TO INSURE <br />WATER TIGHTNESS <br />7 <br />42" MULTIPORT MANHOLE <br />W/ LIQUID TIGHT & VAPOR <br />TIGHT FILL BOX <br />5 GALLON FILL AND <br />VAPOR BUCKETS <br />JUNCTION BOX (EXPLOSION <br />PROOF) <br />1" CONDUIT TO TURBINE <br />SUMP JUNCTION BOX <br />4. <br />1. <br />2. <br />3. <br />USE OPW RISER SUPPORT BRACKETS (BRACELETS) <br />NOTES: <br />STEEL PLATE AT <br />TANK BOTTOM <br />4" ALUMINUM FILL TUBE w/ <br />POSITIVE SHUT OFF DEVICE: <br />INSTALL AT 95% OF TANK <br />CAPACITY <br />17 <br />9 <br />10 <br />12 <br />11 <br />VAPOR BUCKET WITH NO <br />DRAIN <br />14 FACE SEAL ADAPTER <br />90 <br />INSTALL DOUBLE WALLED <br />FIBERGLASS CONTAINMENT <br />SUMP TO AB2481 STANDARD <br />PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS <br />PREFERRED. 15° MAXIMUM ALLOWABLE PENETRATION <br />ANGLE. <br />USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS <br />OF SUMP. <br />ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 1'-0" OF THE <br />TOP OF SUMP. <br />4" FILL CAP <br />FUEL SWIVEL ADAPTOR <br />4" VAPOR CAP <br />VAPOR SWIVEL ADAPTOR <br />SUMP PENETRATION BOOT50 <br />4 <br />4 <br />91 <br />BRINE INTERSTITIAL <br />MONITORING <br />4" SCH. 40 GALVANIZED <br />RISER PRIMED AND <br />WRAPPED <br />2"43°45° <br /> MAX <br />.5 1/2"6" MAX.82 <br />82 <br />RIGID INSULATION AT SUM <br />COLLAR, TYPICAL <br />SEE DETAIL 18/FS5.0 <br />SCALE:3/4" = 1'-0" <br />87 GAS TURBINE SUMP PLAN VIEW <br />3" OVER 2" FRP VENT LINE TO <br />VENT RISER - ZONE 3 <br />WEATHERPROOF JUNCTION BOX, TYP. <br />3" OVER 2" FRP PRODUCT, TO <br />DISPENSERS - ZONE 1 <br />SUMP SENSOR <br />2" BALL VALVE (MAKE HANDLE <br />ACCESSIBLE FROM GRADE) <br />30 <br />38 <br />91 <br />98 <br />98 <br />3X2 SMITH FIBERGLASS BONDED <br />ENTRY FITTING <br />EXTEND TO <br />VACUUM <br />SENSOR <br />4" SCHEDULE 40 PUMP RISER <br />4" OVER 3" FRP VAPOR RETURN LINE - <br />VAPOR ZONE 2 <br />LINE OF VACUUM SENSOR ABOVE <br />LINE OF TURBINE PUMP ABOVE <br />DOUBLE WALL RIGID CONDUIT ENTRY <br />CUFF, TYPICAL <br />98 <br />EXTEND <br />TO PUMP <br />EXTEND TO <br />VACUUM <br />SENSOR <br />EXTEND TO <br />VACUUM <br />SENSOR <br />DOUBLE WALL CONTAINMENT SUMP5 <br />82 <br />EXTRACTOR FITTING, SEE DETAIL <br />8/FS3.1 FOR FRP CONNECTIONS21 <br />MAG PROBE ASSEMBLY7480 <br />4x3 SMITH FIBERGLASS BONDED <br />ENTRY FITTING49 <br />48 <br />48 <br />1" RIGID CONDUIT TO TLM1" RIGID CONDUIT FOR PUMP POWER <br />TO ELECT. PANEL, ONE PER TANK <br />3x2 SMITH FIBERGLASS <br />BONDED ENTRY FITTING48 <br />LINE OF TANK MANWAY COVER <br />2HP VARIABLE <br />SPEED PUMP <br />JUNCTION BOX <br />(EXPLOSION PROOF) <br />DW CONTAINMENT SUMP <br />SCALE:3/4" = 1'-0" <br />87 GAS TURBINE CONTAINMENT - VIEW ELEVATION <br />42" WATERTIGHT <br />MANHOLE <br />28 <br />OPW WATERTIGHT <br />FRP LID 5 <br />5 <br />90 <br />91 <br />BRINE SUMP INTERSTITIAL <br />MONITORING <br />30 <br />SUMP TEST PORT, BEYOND <br />TANK LEVEL MONITOR74 <br />3" OVER 2" NOV RED <br />THREAD II PRODUCT <br />PIPING - ZONE 1 <br />VACUUM SENSOR 84 <br />2" BALL VALVE 38 <br />4" EVR APPROVED CAP80 <br />2" x 12" FLEX CONNECTOR37 <br />TO VAPOR & VENT PIPING, <br />SEE DETAIL 8 / FS3.1 <br />DOUBLE WALL ELECTRICAL <br />CONDUIT ENTRY CUFF, TYP <br />EXTRACTOR, SEE DETAIL <br />8/FS3.1 FOR VAPOR AND <br />VENT CONNECTIONS <br />82SEE DETAIL 18/FS5.0 <br />82 <br />SMITH FIBERGLASS <br />BONDED ENTRY FITTING <br />18 <br />SCALE:3/4" = 1'-0" <br />TANK INTERSTITIAL <br /> MONITOR-VEEDER-ROOT <br />ELECTRICAL JUNCTION BOX <br />18" MANHOLE <br />81 <br />1" RIGID CONDUIT, TYP. <br />4" SCHEDULE 40 PIPE <br />BRINE INTERSTITIAL <br />SENSOR <br />29 <br />80 4" CAP, EVR APPROVED <br />12 <br />NOTE: <br />THE TANK AND THE TANK SUMPS HAVE CALCIUM CHLORIDE <br />IN THE INTERSTITIAL SPACE. <br />CONTRACTOR TO LABEL FILL PORTS WITH TYPE OF FILL.1/8" PE <br />R <br />F <br />O <br />O <br />T <br />SCALE: <br />VIEW OF VAPOR MANIFOLD <br />N.T.S. <br />11 <br />AXONOMETRIC <br />3 <br />3 <br />4" O <br />V <br /> <br />3 <br />" <br /> <br />V <br />A <br />P <br />O <br />R <br />TO 91 T <br />U <br />R <br />B <br />I <br />N <br />E <br />SUM <br />P <br /> <br />- <br /> <br />Z <br />O <br />N <br />E <br /> <br />2 <br />4" OV 3" <br />V <br />A <br />P <br />O <br />R <br />T <br />O <br />87 TUR <br />BI <br />N <br />S <br />U <br />M <br />P <br />ZONE 2 <br />4" OV 3" VAPOR TIE-IN TO <br />91 TURBINE SUMPMIN. 14"DIFFERENCE IN FLOW-LINEELEV.5 5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />NORTH <br />NORTH <br />5 <br />NORTHNORTH66 <br />6 <br />6 <br />4" OV 3" <br />V <br />A <br />P <br />O <br />R <br />T <br />O <br />87 TUR <br />BI <br />N <br />S <br />U <br />M <br />P <br />ZONE 2 <br />1/8" <br />P <br />E <br />R <br /> <br />F <br />O <br />O <br />T <br />6 <br />8 <br />8 <br />8 <br />8 <br />8 <br />8 <br />8 <br />8