My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP TURNPIKE
>
2546
>
2900 - Site Mitigation Program
>
PR0547076
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 12:29:42 PM
Creation date
9/16/2025 2:40:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547076
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026694
FACILITY_NAME
2546 FRENCH CAMP PHASE II
STREET_NUMBER
2546
STREET_NAME
FRENCH CAMP TURNPIKE
City
STOCKTON
Zip
95206
APN
165261260
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2546 FRENCH CAMP TURNPIKE STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• In the event of stoppage in the field due to access issues, request by Client, or unforeseen adverse <br /> conditions outside of FR's control, standby time may necessitate additional cost will be charged. <br /> • Disposal of contaminated soil or water from investigation activities is excluded from this bid proposal <br /> (not expected). <br /> Limitations <br /> • This cost estimate will remain valid for 90 days. <br /> • All work will be performed as FIR, as such, FIR assumes responsibility for professional liability <br /> insurance. <br /> • The project will be conducted during normal business hours. FIR has assumed that property owner <br /> would provide reasonable access to the business units and pertinent tenants (which are subject to <br /> drilling and sampling). Should it be necessary to complete this work during the evening or weekend <br /> hours to avoid negative impact to the operating businesses, overtime rates and additional charges <br /> will be incurred by the drilling subcontractor and FR's personnel, and shall be charged to the Client. <br /> • This cost estimate does not include additional sampling and laboratory analysis beyond that which is <br /> outlined in the proposal. Should it be necessary to include additional samples for analysis, or drill <br /> deeper soil borings for additional assessment, beyond the scope of this agreement, additional costs <br /> will apply.Should contamination be discovered that warrants additional assessment and delineation, <br /> a supplemental scope of work will be proposed. <br /> Proposed Work Schedule <br /> Soil Boring and Groundwater Permits 15 Business Days <br /> Schedule driller Available date to be determined <br /> Pre-drilling activity/Utility Clearance 5 Business Days (Non-expedited) <br /> Geophysical Survey % Business Day <br /> Drilling/Sampling activity 1 Business Day <br /> Laboratory Analysis 7 Business Days <br /> (Normal Turnaround Time) <br /> Final report 5 Business days after receipt of lab <br /> results <br /> Payment <br /> FIR hereby proposes the cost for performing the aforementioned scope of work for the client to be: <br /> $ 11,000.00 <br /> The above-listed price reflects non-expedited fieldwork scheduling and normal lab analysis turnaround <br /> time. Please choose from the following fieldwork scheduling and lab analysis turnaround time options: <br /> • Lab Analysis <br /> 7-day Turnaround (Normal) No additional fee Initial <br /> �J 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.