My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP TURNPIKE
>
2546
>
2900 - Site Mitigation Program
>
PR0547076
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 12:29:42 PM
Creation date
9/16/2025 2:40:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547076
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026694
FACILITY_NAME
2546 FRENCH CAMP PHASE II
STREET_NUMBER
2546
STREET_NAME
FRENCH CAMP TURNPIKE
City
STOCKTON
Zip
95206
APN
165261260
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2546 FRENCH CAMP TURNPIKE STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fulcrum Resources (FR) Environmental conducted a Phase II Limited Subsurface Investigation at 2546 Turnpike <br /> Road, Stockton, California 95206 (subject property) per the request of Pride Group Enterprises (Client). A Site <br /> Location Map illustrating the location of the subject property is provided as Figure 1. <br /> 1.0 Background <br /> FR prepared a Phase I Environmental Site Assessment (ESA) Report for the subject property, dated June 28, 2021. <br /> The following is a summary of findings from FR's Phase I ESA Report: <br /> Summary of Property Description <br /> The subject property, 2546 Turnpike Road, Stockton, California 95206, is located on the east side of Turnpike <br /> Road within a moderately developed, mixed residential and commercial area of Stockton, California. According <br /> to the San Joaquin Assessor's Office, the subject property assessor's parcel numbers (APNs) are 165-261-250- <br /> 000 (northern parcel) and 165-261-260-000 (southern parcel). <br /> The subject property consists of two rectangular-shaped, contiguous parcels that total 3.012 acres in size. The <br /> southern parcel is improved with three commercial structures including a 3,000-square-foot office building, a <br /> 2,250-square-foot shop building, and a 1,600-square foot covered vehicle washing building (subject buildings). <br /> The office building contains a lobby area, small office spaces, a meeting room, a break area, and two restrooms. <br /> A roll-up door is located on the northern side of the structure which opens into the meeting room and break <br /> area. The shop building contains a single open room with two large, raised wood and steel platforms for <br /> additional storage space. A large floor-to-ceiling sliding double-door is located on the northern side of the <br /> structure. The vehicle washing building consists of three open-air washing ports with drains and a grease trap to <br /> contain wastewater from cleaning vehicles. <br /> A small steel shed located adjacent to the shop building houses a potable water well and pump system. The <br /> subject buildings and potable water well are all located along the southern property boundary of the subject <br /> property. The northernmost portion of the southern parcel and the northern parcel are covered with a layer of <br /> gravel and asphalt paving and is utilized for the storage and sale of new commercial semi-trucks. The entire <br /> subject property is surrounded by a 6-foot-high steel chain-link fence topped with barbed wire. There are two <br /> gates to the subject property allowing vehicle access from Turnpike Road immediately to the west. <br /> Exterior building finishes for the office building consist of concrete block walls and wood-framed walls with stucco <br /> siding; a concrete slab-on-grade foundation; and a flat composite roof. Interior building finishes for the office <br /> building consist of laminate and carpet flooring; drywall partitions, and concrete block walls; with acoustic drop- <br /> tile ceilings and exposed beam ceilings. Exterior building finishes for the shop building consist of wood-framed <br /> walls with corrugated steel siding; a concrete slab-on-grade foundation; and a pitched wood-frame and <br /> corrugated steel roof. Interior building finishes consist of concrete floors;wood-frame and corrugated steel walls; <br /> and an exposed wood beam ceiling. <br /> The subject property is currently occupied by Pride Truck Sales, commercial semi-truck dealership and TPine <br /> Leasing Capital Corporation, a lending agency. The subject property is currently owned by Nathan Davidson. <br /> Summary of Property History <br /> Phase II Limited Subsurface Investigation <br /> Fulcrum Resources Environmental 2546 Turnpike Road,Stockton, California 95206 <br /> 202107-8656 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.