My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
----------- <br /> (Total X to X mg/m3 I Use APR*with particulate cartridges appropriate for the hazard;do not exceed MUC**for respirator type; <br /> Particulates) ;confirm procedures for respirator usage with HSE Dept. <br /> -------------------------------------------�--- -------------------- re-----r--------------------------------------H--------ep -------------------------------------------------------------------------------------------- <br /> >mg/m3 i STOP WORK. Implement controls. For persistent levels greater than action level,contact PM and/or Corp <br /> HSE Dept. <br /> ❑ <OTHER> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> *Air-purifying respirator ** Maximum use concentration <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> HSE Program Documents: HSE SOP-460:Field Site Exposure Monitoring,HSE SOP-464:Lead Exposure Control, <br /> HSE SOP-466:Hydrogen Sulfide Exposure Control,HSE SOP 470a Protection from Wildfire Smoke Exposure <br /> E.2. OTHER WORKER EXPOSURE MONITORING/SAMPLING — Applicable ❑ Not Applicable, Not Anticipated <br /> ®Heat/Cold Stress Testing/Monitoring E ❑Wildfire Smoke—Tracking AQI(Air Quality Index) ❑<Other> <br /> ❑Air Sampling(sample collection,passive dosimeter) ❑ Ionizing or Non-ionizing Radiation Testing ❑<Other> <br /> ❑Wipe/Bulk Sampling(to evaluate worker exposure) ❑Noise Testing <br /> Site-Specific Notes,Clarifications: <br /> HSE Program Documents:HSE STD-135:Hearing Protection Program,HSE STD-140:Radiation Safety Program,HSE SOP-230:Ionizing and Non-Ionizing Radiation Protection, <br /> HSE SOP-409:Heat Illness Prevention, HSE SOP-410:Cold Stress Prevention, HSE SOP-462:Asbestos Exposure Control, HSE SOP-464:Lead Exposure Control, <br /> HSE SOP-466:Hydrogen Sulfide Exposure Control,HSE SOP-468a:Respirable Crystalline Silica Exposure Control(US-only),HSE SOP 470a Protection from Wildfire Smoke <br /> Exposure <br /> E.3. FENCELINE/PERIMETER AIR MONITORING ❑ Applicable ® Not Applicable, Not Anticipated <br /> Fence line/perimeter air monitoring to be conducted in accordance with a separate"Perimeter Air Monitoring Plan"for this work;results from fence line/perimeter air <br /> monitoring shall NOT be used as the sole basis for determining work zone atmospheric hazards. <br /> Site-Specific Notes,Clarifications: <br /> PART F-APPROVALS, ACKNOWLEDGEMENTS <br /> F.1.THA PREPARATION, REVIEW/APPROVAL SIGNATURES A THA is typically prepared by project staff,often with input from an HSC,with <br /> review/approval,at a minimum,by PM and/or Field Lead.Corporate HSE staff must be consulted as required or otherwise deemed appropriate*. <br /> Printed Name Signature Date <br /> PREPARER(S) Taleen Cochran 4/17/2025 <br /> THA Printed Name Signature Date <br /> REVIEWED/ Jason Gross 4/25/2025 <br /> APPROVED BY: <br /> (Project Manager or PM- <br /> Designee,at a minimum)** <br /> Elena Robertson 5/30/25 <br /> 5/30/25 <br /> At a minimum,Corp.HSE must review/approve the THA review when Geosyntec staff will encounter"high hazards/high risks,"or perform critical tasks,such as(but not limited to): <br /> Work at heights>10',use personal fall apparatus Implement lockout/tagout controls Wear a respirator <br /> Work at height near overhead electrical utility lines Enter a trench/excavation>5'deep Presence of"high-risk"contaminant(s) <br /> Operate a UTV/ATV,aerial lift or fork-lift Function as a construction"Competent Person' Sustained exposure to wildfire smoke AQIPM 2.5>150 <br /> Tow a trailer on roadway Operate a pneumatic or powder-actuated tool Exposure to radioactive isotopes(a,131 y) <br /> Oversee a hot-work permit system "Qualified"Electrical testing&maintenance>50 V High-risk exposure to:non-ionizing(microwave,EMF,UV, <br /> Enter a hazardous confined/enclosed space High risk,non-typical infectious/pathogenic hazard IR)or ionizing(radio-isotope,x-ray)radiation. <br /> Use of unmanned aerial vehicle(drone) Derive action levels for VOCs or toxic dusts Onsite risk of emergency chemical spill <br /> High-risk ergonomic/musculoskeletal hazard Instrument monitoring for critical exposure risks Applicability of Chemical Anti-Terrorism Standards <br /> Project/Task Name: Well Maintenance THA ver. <br /> aGeosyntec° <br /> consultants THA Date:4/17/25 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.