My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
>23.0% STOP WORK,ventilate to lower 02 to<23%for re-entry. For persistent hazard,contact Corp.HSE Dept. <br /> IMPORTANT: Confirm sufficient oxygen is present(min.12%)to ensure accurate LEL readings. <br /> LEL(Lower <5%LEL Acceptable to continue working in work area;continue to monitor LEL. <br /> Explosive Limit) STOP WORK. Implement controls(reposition workers,ventilate,contain/eliminate source,etc.);resume <br /> >5%LEL work ONLY when LEL readings are<10%,sustained. <br /> <10 ppm Acceptable to continue work without H2S-focused respiratory protection. <br /> ❑ HzS i STOP WORK.Turn off drill rig and vehicles,Move upwind or out of the tank farm.Resume work ONLY after <br /> (Hydrogen Sulfide) >10 ppm readings reduced to<10 ppm <br /> c0 <25 ppm Acceptable to continue work without CO-focused respiratory protection. <br /> ❑ (Carbon >25 ppm STOP WORK.Turn off drill rig and vehicles,Move upwind or out of the tank farm.Resume work ONLY after <br /> Monoxide) — ;readings reduced to<25 ppm. <br /> WILDFIRE ---------------<150 In this Air Quality Index(AQI)range,it's acceptable to continue work without respiratory protection. <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> ❑ SMOKE 151-500 Voluntary use of N95 respirator is appropriate. <br /> (AQI for PM 2.5) >500 STOP WORK,or use APR*with approval of HSE Dept. <br /> ❑ <OTHER> <br /> SITE-DERIVED ACTION LEVELS-Sustained breathing zone action levels;derived based on site contaminants;REVIEW WITH CORP.HSE DEPT.REQUIRED. <br /> <1.0 ppm i Acceptable to continue work without VOC-focused respiratory protection. <br /> Implement controls(reposition workers,ventilation,containment,eliminate source,etc.) to lower VOC <br /> >" ppm exposures to less than specified action level,or use APR*with approval of Corp.HSE Dept. <br /> VOcs :.................................................................................................................................................................................................................................................................................................................... <br /> ® (Volatile Organic X—X ppm Use APR*with VOC cartridges(yellow or black);do not exceed MUC**for respirator type;confirm <br /> Compounds) procedures for respirator usage with HSE Dept. <br /> .........................................................+........................................................................................................................................................................................................................................................ <br /> >1.0 ppm STOP WORK.Implement controls.For persistent levels greater than action level,contact PM and/or Corp <br /> HSE Dept. <br /> <X mg/m3 Acceptable to continue work without particulate-focused respiratory protection. <br /> AIRBORNE > mg/ma Implement controls(water spray,reposition workers,ventilation,containment,etc.)to lower dust levels to <br /> DUST less than specified action level,or use APR*with approval of HSE Dept. <br /> ❑ ( ----g/ <br /> Total X to X m m3 Use APR*with particulate cartridges appropriate for the hazard;do not exceed MUC**for respirator type; <br /> Particulates) E confirm procedures for respirator usage with HSE Dept. <br /> -------- -------- ------- ------ - ------- - ----- -- ---- <br /> >mg/m3 STOP WORK. Implement controls. For persistent levels greater than action level,contact PM and/or Corp <br /> HSE Dept. <br /> ❑ <OTHER> ----r------ ------------------------------------------------------------------------------------------------ <br /> *Air-purifying respirator ** Maximum use concentration <br /> ........................................................................................... ............................................................................................................................................................... <br /> HSE Program Documents: HSE SOP-460:Field Site Exposure Monitoring,HSE SOP-464:Lead Exposure Control, <br /> HSE SOP-466:Hydrogen Sulfide Exposure Control,Wildfire Smoke THA Addendum <br /> E.2. OTHER WORKER EXPOSURE MONITORING/SAMPLING ❑ Applicable ® Not Applicable, Not Anticipated <br /> E.3. FENCELINE/PERIMETER AIR MONITORING ❑ Applicable ® Not Applicable, Not Anticipated <br /> PART F-APPROVALS,ACKNOWLEDGEMENTS <br /> F.1.THA PREPARATION, REVIEW/APPROVAL SIGNATURES A THA is typically prepared by project staff,often with input from an HSC,with <br /> review/approval,at a minimum, by PM and/or Field Lead.Corporate HSE staff must be consulted as required or otherwise deemed appropriate*. <br /> Printed Name Signature Date <br /> PREPARER(S) Taleen Cochran 4/18/2025 <br /> Printed Name Signature Date <br /> Project/Task Name:Well Install, Development,and Destruction THA ver. <br /> aGeosyntec <br /> Consultants THA Date: 04/17/2025 Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.