My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION.................................................................................................................1 <br /> 1.1 Background ..................................................................................................................1 <br /> 1.2 Regulatory Framework.................................................................................................2 <br /> 1.3 Previous Environmental Investigations........................................................................3 <br /> 1.4 Data Gaps For RI/FS....................................................................................................6 <br /> 1.5 Objectives.....................................................................................................................7 <br /> 1.5.1 Radionuclide Monitoring in the Landfill Area.................................................8 <br /> 2. WELL MAINTENANCE....................................................................................................10 <br /> 2.1 Well Re-Survey Activities..........................................................................................10 <br /> 2.2 Well Redevelopment Activities..................................................................................1 l <br /> 2.3 Well Replacement......................................................................................................11 <br /> 2.3.1 Well Destruction Activities............................................................................11 <br /> 2.3.2 Well Installations............................................................................................11 <br /> 2.4 Other Well Maintenance Activities............................................................................12 <br /> 3. GROUNDWATER MONITORING PROGRAM ..............................................................13 <br /> 3.1 Field Inspection and Depth to Water..........................................................................13 <br /> 3.2 Selection of Monitoring Wells for Sampling.............................................................13 <br /> 3.3 Sampling and Analysis...............................................................................................14 <br /> 3.3.1 Field Methods and Procedures.......................................................................14 <br /> 3.3.2 Laboratory Methods and Procedures..............................................................15 <br /> 4. INVESTIGATIVE DERIVED WASTE..............................................................................16 <br /> 5. SCHEDULE AND REPORTING .......................................................................................17 <br /> 6. REFERENCES ....................................................................................................................18 <br /> RRI 2025 Groundwater Monitoring Work Plan ii May 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.