My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> LIST OF TABLES <br /> Table 1: Planned Well Maintenance Activities <br /> Table 2: Monitoring Wells Unable to be Located <br /> Table 3: Proposed Well Construction Details <br /> Table 4: Groundwater Monitoring Plan <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Overview <br /> Figure 3: Proposed Well Maintenance Work <br /> Figure 4: Monitoring Wells and Piezometers -Unable to Locate <br /> Figure 5: Proposed Groundwater Sampling Plan <br /> LIST OF APPENDICES <br /> Appendix A: Standard Operating Procedures for Monitoring Well Development <br /> Appendix B: Standard Operating Procedures for Monitoring Well Installation <br /> Appendix C: Standard Operating Procedures for Low-Flow Sampling <br /> Appendix D: Health and Safety Plan <br /> Appendix E: Quality Assurance Project Plan <br /> RRI 2025 Groundwater Monitoring Work Plan iii May 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.