Laserfiche WebLink
TABLE OF CONTENTS <br /> 1. Introduction 2 <br /> 1.1 Overview 2 <br /> 1.2 Pre-Mobilization Activities 3 <br /> 1.2.1 Equipment and Supplies 3 <br /> 1.2.2 Sample Containers and Preservatives 4 <br /> 1.3 Pre-Sampling Procedures 4 <br /> 1.3.1 Inventory 4 <br /> 1.3.2 Calibration 4 <br /> 1.4 Well Purging and Sampling 5 <br /> 1.4.1 Set-up 5 <br /> 1.4.2 Purging (Low Flow Protocol) 5 <br /> 1.4.3 Sampling 6 <br /> 1.4.3.1 Sample Documentation 6 <br /> 1.4.3.2 Sample Packaging and Shipment 8 <br /> 1.4.4 Clean-Up and Decontamination 8 <br /> LIST OF ATTACHMENTS <br /> Attachment 1: Meter Calibration Form <br /> Attachment 2: Low Flow Sampling Form <br /> 1. INTRODUCTION <br /> 1.1 Overview <br /> This Standard Operating Procedure (SOP)provides details on the groundwater sampling <br /> methodology that will be used following the United States Environmental Protection <br />