My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2026 8:17:33 PM
Creation date
9/19/2025 10:37:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231891
PE
2361 - UST FACILITY
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1941 E LOCKHEED CT STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A N J OAQU I N Environmental Health Department <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> BANK OF STKN AIRPORT HANGAR#3 11941 E LOCKHEED CT, STOCKTON September 26, 2025 <br /> 77 CA Code of Regulations 2712(f) 2030073 - Facility has corrected cited violations within 30 days of receiving report <br /> OBSERVATION: An inspection was last done on October 2, 2024, and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by November <br /> 1, 2024. This information was received on February 5, 2025. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include all of <br /> the recommendations made in the report. The operator shall submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is submitted <br /> and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a (Class 2)Violation. <br /> Overall Inspection Comments <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting paperwork, <br /> by October 26, 2025. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of <br /> having them sign. Starting July 1, 2025, all in-office CERS help will be provided at EHD hourly rate ($179). To <br /> schedule an appointment, please call (209) 468-3420. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: September 26, 2025 Inspector: Inspector Phone: <br /> Printed Name and Title: Allen ASIo, REHS (209)616-3031 <br /> John Kluenker, VP Chief Pilot <br /> EHD-CUPA Inspection Report IS02 Page 6 of 6 FA0003674 PR0231891 4556503 9/26/2025 <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.