Laserfiche WebLink
<br />Preliminary Closure and Postclosure Maintenance Plan 2-10 Department of Public Works/Solid Waste <br />North County Recycling Center and Sanitary Landfill County of San Joaquin <br /> <br />Based on recent refuse disposal rates and the volumetric capacity consumed by this disposal <br />NCRC&SL is expected to reach capacity in approximately 2065 (JTD Table 2). <br />Within the year prior to a partial closure, a contractor will be selected and the closure <br />construction will start and end in one construction season. Subsequent to closure, a CQA <br />Report will be submitted with As-Built Plans to support certification of closure. <br />Full landfill closure will be completed within two years after reaching full capacity. Two years <br />prior to final closure, the County will submit a Final Closure Plan, identifying the work included <br />with closure and a schedule for implementation. This submittal will include a CQA Plan and <br />construction specifications for final closure construction activities. The County may submit these <br />final plans within five years of anticipated partial closure in lieu of submitting new or updated <br />Preliminary Closure and Postclosure Plans. Closure design documents and a CQA Plan will be <br />submitted to regulatory agencies approximately one year prior to partial closure. <br />The County intends to close parts of the landfill (partial final closure), as filling operations are <br />progressively completed. The County will submit Partial Closure and Postclosure Maintenance <br />Plans prior to the anticipated date of a partial closure phase, as needed for regulatory review. <br />2.7 Land Use of Closed Area <br />Section 21790(b) 5 requires a description of proposed postclosure land uses. Section 21190(b) <br />allows development as open space and Section 21190(c) requires proposed postclosure land <br />uses, other than non-irrigated open space, to be submitted for review and approval. <br />The NCRCSL will be utilized as a non-irrigated open area upon closure. The closed landfill area <br />will include landfill facilities such as drainage pipes and structures, benches, access roads, and <br />LFG wells and collection piping. <br />Grass will be planted during closure for erosion control, and the site will be monitored, <br />inspected, and maintained per the approved Postclosure Maintenance Plan. <br />An LFG flare and/or electrical generation facility will be maintained on site. This facility may be <br />placed on the top deck of Area 1 (Figure 5). Adequate foundation materials will be placed under <br />the flare station equipment as needed if this location is selected. <br />2.8 Preliminary Closure Cost Estimate <br />Section 21790(b)(1) requires a closure cost estimate which includes the cost of preparing the <br />Final Closure Plan. Section 21820(a) requires the estimate to be based on hiring a third party <br />contractor to close the landfill in accordance with the submitted Closure Plan. The preliminary <br />cost estimate (Table 2) includes these aspects. <br />