Laserfiche WebLink
5:23 PM 10/30/2024 5 of 6 <br />Table 3A Table 3B <br />Annual Leachate Op. and Maint. <br />( ANNUAL )(per sump) <br />Staff Hours Rate Cost Staff Hrs Period Total hrs Rate Total <br />Dozer operator 40 93.65$ 3,746$ Op I-II 3 per mo.36 63.96$ 2,303$ <br />Laborer 40 65.76$ 2,630$ EA II 1 per mo.12 65.96$ 792$ <br />Dozer or grader 40 104.50$ 4,180$ Eng III 0.5 per mo.6 95.25$ 572$ <br />Op I-II 40 63.96$ 2,558$ Eng V 1 per year 1 139.38$ 139$ <br />Eng I-III 40 95.25$ 3,810$ Total 3,805$ <br />Eng V 6 139.38$ 836$ Pump 6 per year <br />Contractor LS 20,000$ Contractor 12 Sumps 72 150.00$ 10,800$ <br />Total 37,761$ <br />Table 3C Table 3D <br />Quarterly Perimeter Migration Monit.Monthly LFG Well Field Adjust. <br />Staff Hrs Rate Total Staff Hrs Rate Total <br />Op I-II 8 63.96$ 512$ Op I-II 12 63.96$ 768$ <br />EA I-II 2 65.96$ 132$ EA I-II 4 65.96$ 264$ <br />Eng I-III 2 95.25$ 191$ Eng I-III 2 95.25$ 191$ <br />Eng V 2 139.38$ 279$ Total Monthly 1,222$ <br />Total Quarterly 1,113$ <br />Table 3E Table 3F <br />Annual Groundwater Well Maint.Quarterly Record Keeping <br />(per well) <br />Staff Hrs Rate Total Staff Hours Rate Cost <br />Op I-II 4 63.96$ 256$ EA II 16 65.96$ 1,055$ <br />EA I-II 2 65.96$ 132$ Eng III 8 95.25$ 762$ <br />Eng I-III 1 95.25$ 95$ Eng V 4 139.38$ 558$ <br />Total 483$ Total 2,375$ <br />Labor Rates <br />Table 3G County Staff $/Hr Basis <br />Surface Water Sampling Per Event Op I-II 63.96$ Op-II <br />EA I-II 65.96$ EA-II <br />Staff Hrs Rate Total Eng I-II 95.25$ Eng II <br />EA II 6 65.96$ 396$ Eng V 139.38$ <br />Eng III 2 95.25$ 191$ Consultant 185.00$ <br />Eng V 1 139.38$ 139$ Operator 93.65$ Prevailing Wage <br />Total 726$ Laborer 65.76$ Prevailing Wage <br />Top Deck Grading Maintenance <br />Table 3 - Suplemental Tables <br />N:\1North County\CalRecycle-LEA\JTDs\2024 Rev\Appendices\Appendix B - Closure PCMP\NC PCPCMP 10-30-2024 2024 PPCMCE