My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised: 02/02/2023 5 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />6. Transferring <br />Material onto Property <br />- Adverse Weather (wind/ lightning) <br />- Back strain from lifting and moving materials <br />- Being struck by equipment or materials within <br />the work area <br />- Bodily Injury from Awkwad Lifting <br />- Bodily Injury from Shrubs, Cactus Needles or <br />Tree Branches <br />- Dust <br />- Earthmoving equipment (dozers, graders, <br />excavators, trenchers, rollers, compactors, <br />backhoe, skip loader) <br />- Line-of-Fire <br />- Pinch Points <br />- Slips/Trips/Falls <br />1. Clean Fill Material (soil or sand) will be brought onsite by <br />trucks, The trucks will dump the clean fill adjacent to the <br />excavation areas and ICS will utilize a backhoe to add fill <br />material in 6-inch lifts. A vibratory sheeps foot compactor will be <br />used to compact soil to 95% relative compaction.. <br />2. All power equipment must be inspected prior to use. A daily <br />inspection must be completed on SiteDocs. <br />3. Ensure that all PPE is used at all times, especially steel toe <br />boots. <br />4. When unloading material manually or with power equipment, <br />ensure that no one is in front of dumping area. <br />5. Use of proper hand tools (shovels, rakes) when spreading <br />material. <br />6. Use of landscape edging board is properly used and laid in it's <br />appropriate areas. This is to separate material. <br />L <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210
The URL can be used to link to this page
Your browser does not support the video tag.