Laserfiche WebLink
Revised: 02/03/2023 1 <br />ACTIVITY HAZARD ANALYSIS <br />Date Prepared:02 / 03 / 2023 <br />AHA No.:20221122-002 <br />Project Name:Various <br />Activity/Work Task:Crane Work / Shoring Installation / Cleaning of Piles <br />Department/Division/Section:All <br />Location(s):Various <br />Developed By:Terry Dussault <br />Start Date:02 / 01 / 2023 <br />Duration: <br />Level D PPE: Hardhat, Z-87 Safety Glasses, High <br />Visibility Traffic Vest, Long Sleeves, Cut Resistant <br />Gloves, Steel Toe Boot <br />Supervisor:TBD <br />Reviewed By:Health and Safety Dept. <br />Overall Risk Assessment Code (RAC): H <br />RISK ASSESSMENT CODE MATRIX <br />E=EXTREMELY HIGH <br />RISK <br />H=HIGH RISK <br />M=MODERATE RISK <br />L=LOW RISK <br />PROBABILITY <br />FREQUENT LIKELY OCCASIONAL SELDOM UNLIKELY <br />S <br />E <br />V <br />E <br />R <br />I <br />T <br />Y <br />CATASTROPHIC E E H H M <br />CRITICAL E H H M L <br />MARGINAL H M M L L <br />NEGLIGIBLE M L L L L <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />1. Conduct Pre-task Meeting and <br />Establish Work Zone <br />- Traffic hazard <br />- Slips/Trips/Falls <br />1. Decide on a meeting area located in a safe secure area and <br />utilize traffic control devices (i.e. barricades, delineators, cones, <br />snow fence, caution tape and signage) to prevent unwanted <br />traffic. <br />2. Visually scan the area for hazards, keep tools/materials and <br />equipment picked up and out of the way, watch where you walk, <br />beware of loose dirt on surfaes or water that could be slippery, <br />wear boots with adequate tread and a raised heel. <br />L <br />2. Straightening sheet pile with <br />vibe hammer and pulling with <br />loader and rigging <br />- Falling Objects <br />- Faulty Equipment <br />- Heavy equipment hazards could be <br />present <br />- Line-of-Fire <br />- Personal Injury <br />- Struck by Falling Load <br />- Suspended load <br />- Traffic hazard <br />- Trenches and trench shoring <br />1. Stay away from overhead objects <br />2. Inspect rigging <br />3. Maintain radio communication <br />4. Keep all personnel away from the "Line of Fire" <br />5. Inspect all heavy equipment and crane <br />6. Close street to all traffic in teh "Red Zone" <br />L <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210