My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised: 02/02/2023 4 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />5. Traffic control during <br />demobilization <br />- Personal Injury 1. Wear high-visibility reflective vests when exposed to vehicle <br />traffic. Make eye contact with operators before approaching <br />equipment. Understand and review posted hand signals. Use <br />traffic barricades, signs, flags, and backup spotters during <br />demobilization. <br />M <br />6. Removal of temporary fencing - Cuts and/or Abrasions <br />- Slips/Trips/Falls <br />1. Protective gloves will be worn while dismantling fencing. <br />Teams of workers will take down and handle fencing panels. <br />Fence sections will be stacked on trucks or forklifts for transport <br />rather than carrying them. <br />2. Fences that were bolted down will have the bolts removed, <br />sheared, or ground flush to avoid tripping hazards. Tie downs <br />will be removed to restore a flush surface. <br />L <br />7. Final Site Cleanup - Sprains and Strains 1. Use of a loader or other equipment is preferred to lifting. <br />Sweeping with a broom truck and is preferred over hand labor. <br />If hand labor is used, alternate personnel. <br />M <br />Equipment Inspection Training <br />Flagging Ensure that materials comply with Traffic Control Plan specifications. Inspect every day Flagger training by Cal- <br />OSHA regulations <br />Hand Tools Inspect hand tools before each use following manufacturers’ requirements every day <br />prior to use.Competent person <br />Heavy equipment Heavy equipment must be inspected and certified as operational by a qualified person <br />every day prior to use. <br />Competent person <br />Operator Certification <br />Pressure Washer <br />Use form provided in plan or a form provided in the operator’s manual. Pay specific <br />attention to all connections and to the condition of the wand. Inspect every day before <br />use. <br />Competent person <br />Power tools (electric, gas, <br />hydraulic, pneumatic) <br />Do not use power tools that have frayed cords or exposed wiring. All power tools must <br />have a grounding plug or be double-insulated. Inspection should be done every day prior <br />to use. <br />Competent person <br />Qualified Person <br />Fire Extinguisher Inspection should be done every month by a SSHO or designee.Competent person <br />Qualified Person <br />Involved Personnel: ICS Field CrewNC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210
The URL can be used to link to this page
Your browser does not support the video tag.