Laserfiche WebLink
Revised: 02/03/2023 5 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />Trailer Mounted Pressure Washer <br />Use DOT Approved cans for Refueling Typical Spill Kit <br />4. Clean-up and Depart site - Slips/Trips/Falls <br />- Traffic hazard <br />- Housekeeping <br />1. Do a final walk through of the work area to ensure all tools, <br />materials, equipment and debris have been removed. <br />2. Keep all traffic control devices in place until all items have <br />been removed or stowed, watch where you walk, use a spotter if <br />eye contact cannot be maintained with drivers or operators. <br />3. Perform a thorough walk-around of the site prior to departing <br />and verify that all tools materials and equipment have been <br />picked up and trash is removed. <br />L <br />Equipment Inspection Training <br />Pressure Washer Visual Inspection and Functional Test every Shift ICS Field Training <br />Mental Risk Assessment (MRA) <br />(4) Gas Meter Visual Inspection, Functional Test and Calibrate every Shift ICS Designated and Trained Personnel <br />Involved Personnel: ICS Subcontractor <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210