My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised: 01/31/2023 4 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />5. Remove cut pieces - Sprains and Strains to body from <br />lifting <br />- Sharp Edges <br />- Bodily Injury/struck- by or property <br />damage <br />1. If broken pieces are too heavy or awkward ask for help. Do not <br />lift more than 50 lbs. without using the "buddy system". Consider <br />breaking pieces into smaller sizes that are more easy to handle. <br />2. Keep hands clear of pinch points, sharp edges or areas that could <br />cause pinching/crushing. <br />3. Stay out of the line-of-fire of onsite equipment or traffic. Use a <br />spotter if you must crouch down when removing cut pieces. <br />4. Broken concrete will be removed by heavy equipment. If smaller <br />debris of rocks are present, they will be removed by hand or use of <br />a shovel. <br />L <br />6. Confirm all Cutouts are covered or <br />filled <br />- Slips/Trips/Falls 1. Visually inspect each and every coring or cutout then cover all <br />holes or gaps. Do not leave open hole or cuts that could be a hazard <br />to others. Demarcate areas temporarily until hles are filled. <br />L <br />7. Clean Site and Demobilize - Traffic struck-by <br />- Sprains and Strains to body from <br />lifting <br />- Slips/Trips/Falls <br />- Inadequate Communication <br />1. Don't work with your back towards traffic, watch where you <br />walk, use a spotter if traffic is present when putting tools and <br />equipment away. <br />2. Do not lift more than 50 lbs. without using the "buddy system". <br />Use the hydraulic lift-gate on truck to load saw. Remember to lift <br />with your legs and not your back, keep a firm grip on load being <br />lifted. Do not over extend your arms when lifting heavy objects. <br />3. Make sure all slurry is cleaned up and surfaces are dry prior to <br />departure. Leftover slurry must be place in a drum. <br />4. Notify client or Manager prior to departing site. <br />L <br />Equipment Inspection Training <br />Concrete Saw Visual and functional test every 1 use.FIeld Training <br />Involved Personnel: . <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210
The URL can be used to link to this page
Your browser does not support the video tag.