Laserfiche WebLink
Revised: 02/03/2023 4 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />Typical Pneumatic Shear Always Use Whip Check on Air Compressor Hoses <br />6. Clean-up and Depart site - Vehicle and Equipment Traffic <br />- Housekeeping <br />- Misdirected Waste <br />1. Keep all traffic control devices in place until all items have <br />been removed or stowed, watch where you walk, use a spotter if <br />eye contact cannot be maintained with drivers or operators. <br />2. Perform a thorough walk-around of the site prior to departing <br />and verify that all tools materials and equipment have been <br />picked up and trash is removed. <br />3. Verify that liquid waste has been properly stored inside totes <br />or drums and that waste labels are applied prior to departure. <br />L <br />Equipment Inspection Training <br />Pressure Washer Visual Inspection and Functional Test every Shift ICS Field Training <br />Portable Air Compressor Visual Inspection and Functional Test every Shift ICS Field Training <br />Pneumatic Shear Visual Inspection and Functional Test every Shift ICS Field Training <br />Involved Personnel: ICS Field Crew, ICS Subcontractor <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210