My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13 <br /> <br />2.2 SCOPE OF WORK <br /> <br />The plans and specifications supersede this scope and shall not be relied on for project <br />implementation. <br />ICS will provide the labor, equipment, and materials to perform the following activities: <br />I. Mobilization/Pre-Field Activities <br />• Prepare a site-specific health and safety plan (HASP) before the implementation <br />of the proposed demolition and UST removal activities. A daily tailgate safety <br />meeting will be conducted each morning, and Activity Hazard Analyses (AHAs) will <br />be included for all work tasks and any unscheduled work that is performed where <br />the team needs to address a new scope. <br />• Secure the demolition and UST removal permits. ICS has budgeted a total of <br />$2,658 for permit fees. Any additional permit fees will be invoiced at cost + 10%. <br />• Notify the State of California - Cal-OSHA for excavation/trenching activities as per <br />the ICS Annual T-1 Trench Permit. <br />• Notify Underground Service Alert (USA) 48 hours before breaking ground. <br />• Mobilize a 40 -hour HAZWOPER-trained crew, equipment, and temporary facilities. <br />• Install straw wattles around the excavation area to control erosion . <br />• Establish laydown areas for equipment and materials. <br />• Establish stockpile areas for clean and potentially impacted soils. <br /> <br />II. Convenience Store & Trash Enclosure: <br />• Verify lockout/tag out of electrical service to the building. <br />• Remove the entire 1,048 square foot brick convenience store, including the roof <br />structure and interior. <br />• Evacuate all refrigerant from the three condenser units located on the roof. <br />• Properly dispose of all generated construction debris in compliance with the City <br />of Stockton. <br /> <br />III. Canopies: <br />• Verify lockout/tag out of electrical service to the canopies. <br />• Remove two 1,025 square foot steel canopies and four brick-encased steel <br />columns. Canopy footings are to be removed to a depth of four feet. <br />• Properly dispose of all generated metal and construction debris in compliance <br />with the City of Stockton. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.