<br />14 <br /> <br /> <br />IV. Dispenser Removal: <br />• Verify lockout/tag out of electrical service to dispensers. <br />• Remove the dispensers. <br />• Demolish the concrete over the product piping to expose pipe runs. <br />• Properly dispose/recycle the concrete, dispensers, and other related fueling <br />equipment. <br /> <br />V. Hardscape Removal/Tank Excavation: <br />• Break and remove approximately 1,400 square feet of 7" -- 8" thick concrete from <br />over the USTs. <br />• Load, transport, and recycle demolished concrete at a local concrete recycler. <br />• Excavate and stockpile UST/pipeline overburden materials. Cover all removed <br />material with weighted visqueen sheeting. <br />• Install an engineered slide rail shoring system to ensure excavation safety, given <br />the proximity to the planter area and sidewalk. <br /> <br />VI. Tank Cleaning and Removal of USTs and Product Lines: <br />• Drain and rinse the fuel lines back to the USTs (using gravity flow). <br />• Initiate triple rinsing of the UST interior and pipelines , and collect rinseate fluids. <br />Fluids will be containerized in totes pending characterization and off -haul. <br />Manifest and dispose of non -hazardous rinseate liquid at a State -permitted <br />recycling facility. The proposal includes disposal of up to two totes of residual <br />liquids and rinseate. Any additional liquid disposal will be invoiced at an extra <br />cost. <br />• Cut windows into the USTs for inspection and additional cleaning, if required. <br />• Inert with dry ice at a rate of 2 pounds per 100 gallons of tankage. <br />• Upon tank certification, load the USTs onto flatbed trucks with a hydraulic crane. <br />Haul the USTs offsite for proper disposal. <br />• Assist in obtaining confirmation samples as directed by ENGEO. <br />• Maintain best management practices (BMPs) and control stormwater run -off. <br /> <br />VII. Consulting for Closure Reporting <br />• Subcontract with ENGEO (environmental engineering and consulting company) to <br />provide environmental oversight and soil sampling <br />• Coordinate inspections with the CUPA. <br />• ENGEO will collect confirmation samples following excavation activities, including: <br />o Two samples from the base of each tank pit (at the ends of each tank and at a <br />minimum of 2 feet into native soil)