My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025 QTRLY CORRECTION ACTION PLN UPDATES
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_2025 QTRLY CORRECTION ACTION PLN UPDATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 10:55:55 AM
Creation date
10/3/2025 3:03:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025 QTRLY CORRECTION ACTION PLN UPDATES
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brendan P. Kenny, RG <br />Corrective Action Program Update - 1Q2025 <br />April 10 2025 <br />Page 2 <br /> <br />Corrective Action Program Update - 2025_Draft <br /> <br />observed methane content of 4.9% by volume, GP-10S had an observed methane content of 2.2% <br />by volume, GP-11D had an observed methane content of 2.8% by volume, and GP-11S had an <br />observed methane content of 32.7% by volume. <br />On 19 March 2025, GP-10D, GP-10M and GP-10S had observed VOC exceedances of 4,000 ppbv, <br />5,000 ppbv, and 3,600 ppbv, respectively which were above 10 ppbv. <br />Based on the requirements in the CAO and on the above monitoring results, probes GP-10S, GP- <br />10M, and GP-10S will require annual TO-15 sampling due to methane concentrations exceeding <br />1 percent by volume and VOC concentrations exceeding 10 ppbv. Moreover, probe intervals GP- <br />11S and GP-11D will require annual TO-15 sampling due to high methane detection exceeding <br />1% by volume. The TO-15 sampling of these probe intervals will be conducted on an annual basis <br />in accordance with the CAO and submitted as part of the Landfill Gas Extraction System <br />Optimization Report. <br />The first quarter of 2025 probe monitoring data are shown in Table 1. <br />CONTROL SYSTEM PERFORMANCE MONITORING <br />The site sends its LFG to two onsite flares for combustion and to the onsite landfill gas to energy <br />(LFGTE) plant operated by Ameresco. SCS operated and monitored the GCCS including the flares <br />in the first quarter of 2025. <br />The average flow rates to FL-100 and FL-150 were 1,262 scfm and 1,424 scfm, respectively. The <br />average methane content was 46% volume at both flares, FL-100 and FL-150. <br />Flare FL-100 had a total run time of 716.67 hours and a total down time of 27.33 hours in January <br />2025, a total run time of 672 hours and no downtime in February 2025 and, a total run time of <br />743.9 hours and a total down time of 0.1 hours in March 2025. Flare FL-100 recorded a maximum <br />adjusted flow of 1,600 standard cubic feet per minute (scfm). <br />Flare FL-150 had a total runtime of 716.25 hours and a total downtime of 27.75 hours in January <br />2025, a total runtime of 671 hours and downtime of 1 hour in February 2025 and, a total run of <br />743.9 hours and a total down time of 0.1 hours in March 2025. Flare FL-150 recorded a maximum <br />adjusted flow of 1,700 scfm. <br />Except for standard flare malfunctions or shutdowns, the GCCS was operated continuously 24 <br />hours per day without any significant downtime flare time. <br />EXTRACTION WELLS <br />SCS has performed operation and maintenance of the GCCS including extraction wells monitoring <br />and tunning, pipe maintenance, condensate management system inspection and maintenance.
The URL can be used to link to this page
Your browser does not support the video tag.