Laserfiche WebLink
Foothill Landfill <br />Monitoring Implementation Plan <br /> <br /> <br /> <br />MIP Page 9 <br />3.3 Sampling and Analysis <br />The General Permit requires the sampling and analysis of storm water from the two (2) <br />qualifying storm events within the first half of each reporting year (July 1 - December <br />31), and two (2) qualifying storm events within the second half of each reporting year <br />(January 1 - June 30). A qualifying storm event (QSE) is a precipitation event that: <br />1. Produces a discharge for at least one drainage area, and <br />2. Is preceded by 48 hours with no discharge from any drainage area. <br /> Samples must be collected from each drainage area at all drainage locations. Samples <br />from each discharge location shall be collected within 4 hours of the start of the discharge or <br />the start of facility operations if the QSE occurs within the previous 12-hour period (e.g., for <br />storms with discharges that begin during the night for facilities with day-time operating <br />hours). If there are not at least two QSEs in each half of a reporting year due to drought <br />conditions, no non-QSEs or any other unavoidable reason according to the General Permit <br />Fact Sheet section II.J there is no violation committed against the General Permit for not <br />collecting two QSEs in each half of a reporting year. A justification as to why the sampling <br />and observations were not conducted must be included in the annual report. <br />Samples are collected using clean collection containers/devices and placed into sample <br />containers provided by the laboratory. Section 4.0 describes, in detail, the proper sample <br />management techniques including sample preservation, documentation, storage, <br />transportation to the laboratory, and analytical procedures. <br />3.4 Annual Comprehensive Facility Compliance Evaluation <br />General Permit requires an Annual Comprehensive Facility Compliance Evaluation (annual <br />evaluation) be performed that includes an inspection of the facility to identify areas that <br />discharge storm water and determine whether the BMPs are being implemented adequately <br />and properly. The annual inspection is also intended to identify whether additional controls <br />are needed to prevent pollution of storm water. <br />The annual inspection is conducted within eight to sixteen months of the previous year’s <br />inspection. However, it is recommended to complete the inspection in May of each year. The <br />inspections include: <br />• A review of all sampling, visual observations, and inspection records conducted <br />during the previous reporting year. <br />• An inspection of all areas of industrial activities and associated potential pollutants <br />sources for evidence of, or the potential for, pollutants entering the storm water <br />conveyance system. <br />• An inspection of all drainage areas previously identified as having no exposure to <br />industrial activities and materials in accordance with the definitions in section XVII <br />of the General Permit. <br />• An inspection of equipment needed to implement the BMPs. <br />• An inspection of any BMPs.