Laserfiche WebLink
Foothill Landfill <br />Monitoring Implementation Plan <br /> <br /> <br /> <br />MIP Page 17 <br />4.1.10 Additional WDR-required Monitoring <br />WDR-Required Storm Water Monitoring: <br />In addition to the above-described monitoring, the County is required to also monitor storm <br />water flows semiannually for the semiannual field and monitoring parameters specified in <br />“Table A.4.b” of Order No. R5-2015-0058 (refer to Table MIP-4 and Appendix B of this <br />SWMP). Take special note that every five years the WDR-required constituents of concern <br />(COC) must be sampled and analyzed. Sampling is required to be conducted at the following <br />locations (see table below and refer to SWPPP Map 2 of this SWMP): <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Table MIP-4.1.1.A <br />WDR-Required Constituents of Concern <br />Table MIP-4.1.1.B <br />Description of WDR Sampling Points