Laserfiche WebLink
�►f'f'I .0c vs. <br /> 2030 PM —2145 PM PST-AIS began site breakdown and waste staging for demobilization activities back to AIS <br /> Operations Base. <br /> 2200 PM PST-AIS departed site. <br /> 2400 PM PST-Operations completed. <br /> Waste/ Material Generated: <br /> 1. 1x55g (oily rags/debris/ppe) <br /> 2. 1x55g(oily absorbent mate ria l/debris/ppe) <br /> 3. 1x55 (oily cardboard/metal components) <br /> "Waste/Material generated staged on-site pending transportation and disposal by generator ** <br /> Security Seal Info <br /> Security Seal Removed : #99280587 FXF <br /> Security Seal Affixed: # UL 0630851 <br /> AIS Clean-Up Summary Report Prepared by: <br /> Carlos Sanchez/ Response Manager NORCAL Region <br /> American Integrated Services <br />