My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP TURNPIKE
>
2546
>
2900 - Site Mitigation Program
>
PR0547561
>
CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 2:50:45 PM
Creation date
10/21/2025 9:40:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
CORRESPONDENCE
RECORD_ID
PR0547561
PE
2953 - LCL HW CLEANUP SITE
FACILITY_ID
FA0027054
FACILITY_NAME
FRENCH CAMP HOLDING O/A PRIDE GROUP ENT
STREET_NUMBER
2546
STREET_NAME
FRENCH CAMP TURNPIKE
City
STOCKTON
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2546 FRENCH CAMP TURNPIKE STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Memorandum <br /> Review of Work Plan for Additional Investigation <br /> 2546 French Camp Turnpike,Stockton,CA 95206 <br /> Page 2 of 2 <br /> depth of 5 feet below ground surface (bgs) to install temporary soil vapor wells. Soil vapor analyses will <br /> include total petroleum hydrocarbons as diesel range organics (TPH-DRO), soil vapor sampling will be <br /> performed utilizing sorbent tubes and shall be analyzed by McCampbell Analytical of Pittsburg,California <br /> for volatile organic compounds(VOCs)and TPH-DRO by EPA Method TO-17.Soil vapor well installation <br /> and sampling will be conducted in general accordance with the Advisory—Active Soil Gas Investigations, <br /> California Department of Toxic Substances Control(DTSC),July 2015. <br /> After sampling is complete, the soil vapor well tubing will be pulled out of the ground by hand, and the <br /> boreholes with be abandoned with neat cement and patched at the surface to substantially match original <br /> ground conditions. <br /> The results of the additional soil vapor sampling will be submitted to the EHD for review within 30 days <br /> of completion of field activities. Analytical results will be evaluated relative to the SFBRWQCB <br /> Environmental Screening Levels (ESLs) published in January 2019, and the screening levels established <br /> by the California Department of Toxic Substances Control, Human and Ecological Risk Office (HERO), <br /> Human Health Risk Assessment(HHRA),Note No. 3,June 2020. <br /> RECOMMENDATIONS <br /> Based on a review of the Work Plan,Condor concurs that the proposed additional investigation is adequate <br /> to evaluate potential off-site vapor encroachment risks to nearby sensitive receptors. Please ensure that the <br /> selected analytical laboratory maintains the appropriate accreditation for the proposed analyses to prevent <br /> potential delays or resampling requests due to data reliability concerns. Coordinate with EHD to obtain the <br /> necessary drilling permits prior to initiating field activities. Following completion of sampling activities, <br /> ensure that all temporary soil vapor wells are destroyed pursuant to EHD's Well Standards (San Joaquin <br /> County Ordinance Code Section 9-1115.6). Upon receipt of analytical results, submit a revised Site <br /> Characterization and Closure Report incorporating the updated risk evaluation. <br /> Respectfully, <br /> CONDOR EARTH �S\pNAL OFO NG y;L GF <br /> Q� !O �F.D�N P (.q,�!O <br /> dLUKE 8�( CL� <br /> N No.9945 I N0.6795 ;i <br /> SOF CA0, 0 F Or ; <br /> Luke Castle,PG No. 9945 October 13,2025 John P.Lane,PG No. 6795 October 13,2025 <br /> Associate Geologist Environmental Services Manager <br /> https://condorearth.sharepoint.com/sites/Project/Shared Documents/8000_pd/8845 SJCERD Geologist Support/8845 Site Mitigation <br /> Support/SR0086563 2546 French Camp/20251010-Further Action/L 20251013 French Camp Tumpike.docx <br /> �i� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.