My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 8:06:38 PM
Creation date
11/7/2025 10:04:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231736
PE
2361 - UST FACILITY
FACILITY_ID
FA0002562
FACILITY_NAME
SUTTER TRACY COMMUNITY HOSPITAL
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23308101
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1420 N TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> COUNTY <br /> 175 4 Greatness grows here. <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> Sutter Valley Hospitals dba Sutter Tracy Community Hospital 1(209) 832-6032 1 November 13, 2025 <br /> Facility Address: CERS ID: <br /> 1420 N Tracy BLVD, Tracy, CA 95376 10397599 <br /> Inspection Contact: Title: Phone: <br /> Brent Matteroli Manager (209) 678-1084 <br /> Inspection Type: Program: <br /> Routine 2361 - UST FACILITY <br /> Consent For: Consent Given By: <br /> ■ Inspection ■ Photos ■ Samples Brent Matteroli, Manager <br /> Service Technician Onsite: Exp.Date: Designated Operator: Exp.Date: <br /> Isaac Anderson 10/16/2026 Issac Anderson 10/16/2026 <br /> Service Technician Manufacturer's Training: <br /> Veeder-Root, 8/24/2026; OPW, 4/22/2026; , <br /> OUT=Violation R=Repeat Violation COS=Corrected on site during inspection <br /> 1 25284; CCR 2711(d) 2030021 - Facility has a valid Permit to Operate from the CUPA ❑OUT ❑ R ❑COS <br /> 2 2711 2010010-Complete and accurate UST Operating Permit Application has been ■OUT ❑ R ■ COS <br /> submitted. <br /> 3 2632(d)(1), 2634(d) 2010013- Facility has submitted a complete and accurate UST Monitoring Plan. ❑OUT ❑ R ❑COS <br /> 4 2632(d)(2), 2634(e) 2010014-Facility has submitted a complete and accurate UST Response Plan. ❑OUT ❑ R ❑COS <br /> 5 2632(d), 2641(h) 2030041 -A current facility plot plan is maintained and has been submitted ❑OUT ❑ R ❑COS <br /> 6 25299(a)(8), 25299(b)(7) 2010006-Owner/Operator has not made false statements, certifications, or ❑OUT ❑ R ❑COS <br /> representations on documents <br /> 7 2715(a)(1)(B), 2715(a)(3) 2010003-Owner/Operator submitted DO form and/or informed the CUPA of any ❑OUT ❑ R ❑COS <br /> change(s)within 30 days(TCR 10) <br /> 8 2715(a)(1)(A), 2715(a)(2) 2010016-"Underground Storage Tank Statement of Understanding and ❑OUT ❑ R ❑COS <br /> Compliance Form"submitted (TCR 10) <br /> 9 2638, 26410), 2715(f) 2030002-Leak detection equipment tested by qualified service technician every ❑OUT ❑ R ❑COS <br /> 12 months (TCR 9d) <br /> 10 2638(c), 2638(d) 2030074-Annual Monitoring System Certification Form to the CUPA within 30 ❑OUT ❑ R ❑COS <br /> days of completion of the test <br /> 11 2637(a-d), 2712(b)(1)(F) 2030048-Sec containment testing conducted per requirements&records kept for ❑OUT ❑ R ❑COS <br /> 36 mths(TCR 9d) <br /> 12 2637(e), 2637(f) 2010009-Secondary containment test results submitted to the CUPA within 30 ❑OUT ❑ R ❑COS <br /> days after the test. <br /> 13 2637.1(d),2637.1(e) 2010017-Spill bucket testing results submitted to the UPA within 30 days of testing ❑OUT ❑ R ❑COS <br /> 14 2637.2(d&e), 2665(a&b) 2010018-Overfill prevention equipment inspection report form submitted to the ❑OUT ❑ R ❑COS <br /> UPA within 30 days <br /> 15 2636(f)(3), 2643(c)(3) 2030042-Line integrity test completed on DW press piping every 12 mths if no fail ❑OUT ❑ R ❑COS <br /> safe/+shutdown (TCR 9d) <br /> 16 2643(d), 2661(f) 2030050-0.1 gph piping test conducted on SW suction systems every 36 mths ❑OUT ❑ R ❑COS <br /> and after piping repair(TCR 9d) <br /> 17 2643(e), 2661(f) 2030051 -0.1 gph piping test conducted on SW gravity systems every 24 mths and ❑OUT ❑ R ❑COS <br /> after piping repair(TCR 9d) <br /> 18 2663, 2712(b)(6) 2030029-Tank lining inspected w/in 10 years of lining, every 5 years after, cert ❑OUT ❑ R ❑COS <br /> submitted to CUPA(TCR 9c) <br /> 19 2644.1(a)(5) 2010005- ELD testing results sent to the board and the CUPA within 60 days of ❑OUT ❑ R ❑COS <br /> completion of the test <br /> 20 2646.10) 2030056-SIR Report submitted to the CUPA every 12 months ❑OUT ❑ R ❑COS <br /> EHD-CUPA Inspection Report IS02 Page 1 of 5 FA0002562 PR0231736 4576491 11/13/2025 <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.