leainftbor5 <br /> Personal Air Monitoring will be conducted utilizing a Photo Ionization Device(PID) in conjunction with a <br /> PDR-1000 dust meter and personal air monitoring pumps (NIOSH Method mod. OSHA ID-160; PCM) <br /> during all intrusive work being completed onsite to ensure employee safety. Air monitoring will be <br /> performed on the person with the most potential for exposure, typically the excavator operator, and will be <br /> adjusted or expanded as needed to protect the crew. HASP is included as Attachment 1. <br /> Air monitoring proximate to the work location will also be performed. Soil activities at the site during <br /> excavation must not cause particulate matter of 10 (PM10) levels to exceed 50 micrograms per cubic meter <br /> (50 ug/m3)when determined by simultaneous air monitoring as the difference between upwind and <br /> downwind measurement in accordance with Title 17 California Code of Regulations section 70200, Table of <br /> Standards, including Article 2 on Ambient Air Quality, and SCAQMD Rule 403, Fugitive Dust. PDR-1000 <br /> dust meters will be placed, upwind and downwind of the excavation activities,to the extent possible due to <br /> the open cell to the south of the work area. In addition, Clean Harbors will also utilize personal H2S <br /> monitors while conducting the work onsite as a Clean Harbors standard while working in Landfills. <br /> Based on the information provided about the potential contaminants encountered during the project, Clean <br /> Harbors assumes that the work will be completed with Level D Personal Protective Equipment(PPE),which <br /> at a minimum will include the following: <br /> ➢ Steel Toed Boots <br /> ➢ Hard Hats <br /> ➢ High-Vis Vests <br /> ➢ Eye Protection <br /> SLOPING/BENCHING <br /> The material of concern is currently located in a stockpile. Clean Harbors will segregate, screen and stockpile <br /> the material into approximately 200 CY stockpiles. Clean Harbors will only be removing material from the <br /> stockpile to the surrounding ground elevation. No sloping and benching will be required. Please refer to <br /> Attachment 2 of the Surveyed Stockpile. <br /> LINER SYSTEM SEPARATION DISTANCE <br /> Clean Harbors does not have any concerns about exposing the liner system of the cell when completing the <br /> stockpile loadout. <br /> LABOR, EQUIPMENT, AND MATERIALS <br /> Upon proper notification to Republic Forward Landfill, Clean Harbors will mobilize the following OSHA 40 <br /> HAZWOPER trained labor, equipment, and materials, or equivalent, to perform the work. Labor and <br /> equipment will be revised and adjusted as needed to support actual site conditions and needs. At the current <br /> time, there are winterized access roads onsite, so Site improvements are not anticipated. <br /> Labor <br /> Clean Harbors will mobilize a single crew consisting of. <br /> 2 <br /> VSAFETYFIRST! <br />