My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:02:38 PM
Creation date
1/6/2026 3:31:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231784
PE
2361 - UST FACILITY
FACILITY_ID
FA0003834
FACILITY_NAME
H&S Energy Products, LLC #3081
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6633 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for H&S <br /> Energy Products, LLC #3081 as of March 04, 2026. <br /> Open violations from January 20, 2026 inspection <br /> OBSERVATION:An inspection was last done on 1/23/25 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance.This information was required to be submitted by 2/22/25. This <br /> information has not been received resulting in a non-compliant status for this facility. <br /> -Open Violation 2030073:An inspection was last done on 1/30/2024 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 2/29/2024.This information was received on 3/6/2024, 6 days late. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> OBSERVATION: Owner/Operator failed to submit a complete and accurate UST Response Plan. <br /> -The emergency contact information of persons responsible were missing. <br /> CORRECTIVE ACTION: Submit a complete and accurate UST Response Plan into CERS. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> OBSERVATION: Records of installation, repairs, linings, intregrity certification,tank calibration charts, and/or <br /> unauthorized release reports were not kept onsite, or offsite if approved by the UPA,for the life of the UST. <br /> CORRECTIVE ACTION: Immediately locate and maintain these records onsite and submit copies to the UPA within 30 <br /> days. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.