Laserfiche WebLink
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for H&S Energy Products, LLC #3081 as of March 04, 2026. <br /> Open violations from January 23, 2025 inspection <br /> Violation#77-2030073-Facility has corrected cited violations within 30 days of receiving report. <br /> OBSERVATION:An inspection was last done on 1/30/2024 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 2/29/2024. This <br /> information was received on 3/6/2024, 6 days late. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include all <br /> of the recommendations made in the report.The operator shall submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 2 <br />