My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:11:35 PM
Creation date
1/7/2026 1:15:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231126
PE
2361 - UST FACILITY
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED #5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1469 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. CONTAINMENT SUMP AND UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Omntec Proteus CLD Sump Tester w/ + or— 0.002" graduations <br /> ® Check this box if Appendix 8.3 continuation page is attached. <br /> Sump/UDC ID T-1 87 North T-2 87 South T-3 91 T-4 Diesel <br /> Sump Manufacturer Total Containment Total Containment Total Containment Total Containment <br /> Sump Depth (inches) 84" 85" 84" 84" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 26" 30" 26" 26" <br /> (inches) <br /> Test Start Time 2:53pm 4:02pm 2:53pm 4:02pm <br /> Initial Reading 8.540" 6.758" 8.811" 6.113" <br /> Test End Time 3:08pm 4:17pm 3:08pm 4:17pm <br /> Final Reading 8.540" 6.758" 8.811" 6.113" <br /> Change in Reading 0.00" 0.00" 0.00" 0.00" <br /> Pass/Fail Criteria + or— 0.002" + or— 0.002" + or— 0.002" + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Continuity Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 1-2 UDC 3-4 UDC 5-6 UDC 7-8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 12" 12" 32" 32" <br /> Sump Bottom to Top of Piping comes Piping comes <br /> Highest Pipe Penetration in from bottom in from bottom 13" 13" <br /> inches of UDC of UDC <br /> Test Start Time 11:48am 11:48am 11:48am 11:48am <br /> Initial Reading 2.714" 4.460" 8.551" 9.930" <br /> Test End Time 12:03pm 12:03pm 12:03pm 12:03pm <br /> Final Reading 2.714" 4.459" 8.391" 9.928" <br /> Change in Reading 0.0013 -0.00011, -0.160" -0.002" <br /> Pass/Fail Criteria + or— 0.002" + or— 0.002" + or— 0.002" + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ® Fail ® Pass ❑ Fail <br /> Continuity Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ® Fail ® Pass ❑ Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.