My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:11:35 PM
Creation date
1/7/2026 1:15:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231126
PE
2361 - UST FACILITY
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED #5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1469 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 8.3 <br /> Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Containment Sump and UDC Test Continuation Page <br /> CERS ID Facility Name Test Date <br /> 10180781 United Pacific #5447 1-28-26 <br /> 8. CONTAINMENT SUMP AND UDC TEST (continued) I <br /> Sump/UDC ID UDC 9-10 <br /> Sump Manufacturer Bravo <br /> Sump Depth (inches) 32" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 13" <br /> inches <br /> Test Start Time 12:34pm <br /> Initial Reading 8.363" <br /> Test End Time 12:49pm <br /> Final Reading 8.363" <br /> Change in Reading 0.000" <br /> Pass/Fail Criteria + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer I <br /> Sump Depth (inches) I <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time I <br /> Initial Reading I <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Describe in Section 9 all tests marked "Fail'and any repairs made during the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.