My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 11:41:56 AM
Creation date
1/7/2026 1:28:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231070
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2575 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN aOAQUIN AMENDED Environmental Health Department <br /> —COUNTY— 1�22�2026 <br /> „realness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> COUNTRY CLUB MOBIL CIRCLE K 12575 COUNTRY CLUB BLVD STOCKTON JanuarV 20 2026 <br /> 4 23 CCR 16 2613(a)(4) and (b), 2650(a), (c), and (e) 2011012 - Facility has submitted and maintains a monitoring site <br /> plan <br /> OBSERVATION: Owner/Operator failed to submit and maintain a monitoring site plan for approval by the UPA. <br /> -The monitoring site plan must include, but is not limited to, the following: (1) a scaled diagram indicating the layout of <br /> the tank(s) and piping to the extent known, including containment sumps. (2) locations of all release detection equipment; <br /> and (3) if applicable, each vacuum, pressure, or hydrostatic interstitial monitoring zone. <br /> -An approved copy of the monitoring plans were not available on site for inspection. <br /> CORRECTIVE ACTION: Submit a complete and accurate UST Monitoring Site Plan to CERS and maintain copy onsite <br /> for review. <br /> This is a Repeat (Class 2)Violation. <br /> 5 23 CCR 16 2613(a)(6) and (b), 2650(a), (d), and (e) 2011013 - Facility has submitted a complete and accurate UST <br /> Response Plan <br /> OBSERVATION: Owner/Operator failed to submit a complete and accurate UST Response Plan. <br /> -The emergency contact information of persons responsible were missing. Include phone numbers for each persons. <br /> CORRECTIVE ACTION: Submit a complete and accurate UST Response Plan to CERS and maintain copy onsite for <br /> review. <br /> This is a Repeat (Class 2)Violation. <br /> 6 23 CCR 16 2613(a)(7), 2690(a)(5); HSC 6.7 25292.2 2011008-Submitted/maintained current Cert of Financial <br /> Responsibility/mech of financial assurance (TCR 11) <br /> OBSERVATION: Owner/Operator failed to submit and/or maintain a complete and current Certification of Financial <br /> Responsibility or other mechanism of financial assurance. <br /> -The most recent financial responsibility documents in CERS are dated 8/1/24. <br /> - Current financial responsibility documents were not found on site. <br /> CORRECTIVE ACTION: Submit to CERS a complete and current Certification of Financial Responsibility, or other <br /> mechanism of financial assurance within 30 days. Maintain a copy onsite for review. <br /> This is a Repeat (Class 2)Violation. <br /> 30 23 CCR 16 2613(c)(3), 2633, 2640(e), 2642(k), 2660(c) and (e), 2664; HSC 6.7 25284.2 2031001 - Spill buckets meet <br /> requirements, have been tested as required, and records kept for 36 mths (TCR 9a) <br /> OBSERVATION: Owner/Operator failed to meet one or more of the following spill container requirements: maintain <br /> testing records for 36 months. <br /> -3/15/23 Spill Container test results not on site. <br /> - 1/31/24 Spill Container test results not on site. <br /> - 1/24/25 Spill Container test results not on site. <br /> CORRECTIVE ACTION: Maintain copies on site for all testing records for 36 months. <br /> This is a Repeat (Class 2)Violation. <br /> 31 23 CCR 16 2613(c)(4), 2633, 2640(f), 2660(c) and (e), 2665 2031002 - Overfill prevention system meets overfill <br /> requirements, tested as required, records kept (TCR 9b) <br /> OBSERVATION: Owner/Operator failed to meet one or more of the requirements applicable to overfill prevention <br /> equipment: <br /> -Overfill prevention testing was previously performed on 1/26/21 and was due on January 2024. The testing was <br /> completed on 12/16/25, 23 months past due. <br /> - 12/16/25 Overfill Prevention test results not on site. <br /> CORRECTIVE ACTION: Maintain overfill prevention system to comply with the deficiencies noted above. Maintain copies <br /> on site for all testing records for 36 months. The next testing due date is January 2027. <br /> This is a Repeat (Class 2)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 4 of 6 FA0006439 PR0231070 4601876 1/22/2026 <br /> CP26-U aST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.