Laserfiche WebLink
The following is an itemized list of CP22 - UST FULL violations that have not been <br />addressed for GAVINKO PETROLEUM* as of January 07, 2026. <br />Open violations from October 16, 2025 inspection <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Violation #7 - 2010003 - Owner/Operator submitted DO form and/or informed the CUPA of any change(s) <br />within 30 days (TCR 10). <br />OBSERVATION: A new designated operator , Eric Meeker, began conducting inspections on 5/9/25 and notification <br />was not provided to the EHD within 30 days of the change. <br />REGULATION GUIDANCE: The owner or operator shall submit a "Designated Underground Storage Tank Operator <br />Identification Form" no later than 30 days after any change in the designated UST operator (s). <br />CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS) at <br />http://cers.calepa.ca.gov and upload the notification identifying all the designated operators for this facility. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Page 2 of 5