Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 6. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5.1 continuation page is attached. <br /> List only sensors tested. List "Sensor ID',as labeled in system programming. For VPH monitoring. <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practicaf as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Model Component(s) Monitored Function Continuity <br /> ID Pass Fail Pass Fail NA <br /> L1 794380-209 91 STP ❑ [] 0 <br /> L2 794380-209 87 STP ❑ El ❑ 0 <br /> L3 794390-409 91 ANNULAR 0 ❑ Li ❑ 0 <br /> L4 794390-409 87 ANNULAR 0 ❑ Lj ❑ 0 <br /> L5 794380-208 D1/2 0 ❑ D Q 0 <br /> L6 794380-208 D3/4 0 1-j Ij LI 0 <br /> L7 794380-208 D5/6 0 ❑ 0 <br /> L8 794380-208 D7/8 0 [j ❑ ❑ 0 <br /> L9 794380-208 D9/10 0 ❑ 1-1 11 0 <br /> L10 794380-208 D11/12 0 ❑ D ❑ 0 <br /> ❑ ❑ 1:1 ❑ ❑ <br /> ❑ ❑ D ❑ ❑ <br /> ❑ ❑ A ❑ ❑ <br /> ❑ ❑ D ❑ ❑ <br /> ❑ ❑ Ij ❑ ❑ <br /> ❑ ❑ Ll ❑ ❑ <br /> ❑ ❑ ❑I ❑ ❑ <br /> ❑ ❑ El ❑ ❑ <br /> ❑ ❑ E) ❑ ❑ <br /> ❑ ❑ ❑ ❑ Lj <br /> ❑ ❑ ❑ ❑ j <br /> Describe all answers marked 'No" or "Fail'and the proposed remedy in Section S. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section B. <br /> Page 3of6 <br />