My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 9:19:15 AM
Creation date
1/21/2026 8:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
AMMENDED JTD 1/5/2026
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit TotalItem Description Units Price Quantity Cost1 FINAL COVER MAINTENANCEac NA674Components: Replace 6 inches of cover and re-vegetation of a portion of the final cover, and mowing of entire cover.Foreman hr. 131.83$ 10413,710$ Motor Grader w/Operator hr. 432.41$ 104 44,971$ Scraper w/ Operator hr. 319.18$ 104 33,195$ Pad foot Compactor w/ Operator hr. 343.47$ 104 35,721$ Water Truck w/ Operator hr. 209.50$ 104 21,788$ Grade Checker hr. 126$ 104 13,094$ Mowing ac 259.00$ 674 174,566$ Vegetation (hydroseeding, mulching, fertilizing) ac 4,992$ 23 114,816$ Total Cost 451,861$ 2 LEACHATE CONTROL AND MONITORINGComponents: Leachate management cost per gallon for 6,000 gallons annually. Sampling and testing of leachate on a quarterly basis.Operation, Maintenance, and Disposal sump 14,691.00$ 10146,910$ Subtotal, Pumping and Treatment Cost 146,910$ Sampling and Reporting sample 652$ 10 6,520$ Testing sample 906$ 10 9,060$ Subtotal, Annual Monitoring Cost 15,580$ Total Annual Cost 162,490$ TABLE C-2PRELIMINARY POST- CLOSURE OPERATIONS AND MAINTENANCE COST ESTIMATE FOOTHILL SANITARY LANDFILLAugust 28, 2025Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 10 of 15
The URL can be used to link to this page
Your browser does not support the video tag.