My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 9:19:15 AM
Creation date
1/21/2026 8:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
AMMENDED JTD 1/5/2026
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 MONITORING AND LANDFILL GAS CONTROLGroundwater and Surface Water MonitoringComponents: Quarterly Groundwater Monitoring at 8 wells plus two stormwater outlet locations.Annual Sampling, Testing, and Reporting sample 6,590$ 24 158,160$ Subtotal, Annual Monitoring Cost 158,160$ Five-Year Monitoring and Report of Constituents of Concern AnalysisComponents: This is a five year requirement that is included above. LS -$ 1 -$ Subtotal, Five-Year Monitoring -$ Annual Cost, 1/5 -$ Groundwater Monitoring Well RepairsComponents: Well Repairs, including replacement of the protective steel covers twice over 30 yrs. on all groundwater monitoring wells.Steel Covers ea. 100$ 24 2,400$ Keyed-alike Locks ea. 25$ 24 600$ Misc. Supplies (i.e. cement, paint, etc.) ea. 250$ 24 6,000$ Field Technician(Environmental Specialist) hr. 153.00$ 7211,016$ Project Manager/Engineer/Geologist hr. 224.00$ 163,584$ Subtotal Groundwater Well Maintenance and Repairs 23,600$ Landfill Gas MonitoringComponents: Quarterly Landfill Gas Monitoring and Reporting Surface Emission Monitoring ls 69,831$ 169,831$ Sampling and Reporting ls 7,201$ 17,201$ Testing ls 9,053$ 19,053$ Subtotal, LFG Monitoring Event 86,085$ Landfill Gas System Operation and MaintenanceComponents: Annual system and monitoring probe maintenance and repairs.Landfill Gas System Maintenance and Operation ls 1,812,995$ 1 1,812,995$ Subtotal Landfill Gas System Maintenance and Operation 1,812,995$ Vadose Zone MonitoringComponents: Annual Vadose Zone Monitoring and Reporting Sampling and Reporting ea. 163$ 20 3,260$ Testing ea. 259$ 20 5,180$ Subtotal, Vadose Zone Monitoring Event 8,440$ Total Cost for Monitoring and Landfill Gas Control 2,112,880$ Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 11 of 15
The URL can be used to link to this page
Your browser does not support the video tag.