My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosptec <br /> consultants <br /> prepared in cooperation and in response to the CVRWQCB's request for additional investigation along <br /> West Hammer Lane and to support Site closure by evaluating vapor intrusion on-Site. <br /> 1.2 Work Plan Objectives <br /> The primary objectives of this Work Plan are to describe rationale and approach for the proposed sample <br /> collection activities, to collect data to support assessment of the potential source and pathway of the off- <br /> Site PCE concentrations reported in domestic supply wells and to collect the data necessary on-Site to <br /> progress the Site towards closure. Ultimately,the data collected as part of this Work Plan is anticipated to <br /> confirm that PCE impacts in the off-Site domestic wells are related to another off-Site source(s), and if <br /> previous indoor air data are confirmed progress the Site towards closure. <br /> 1.3 Document Organization <br /> The Work Plan is organized as follows: <br /> • Section 2-Background describes the Site setting, geology, and hydrogeology. This section also <br /> provides a summary of previous investigation activities at the Site; <br /> • Section 3 - Scope of Work describes the scope of work including the rationale and approach, pre- <br /> field activities, soil vapor probe installation and sampling, indoor and outdoor air sampling, sub- <br /> slab soil vapor sampling, equipment decontamination, waste management, and quality assurance <br /> and quality control methods; <br /> • Section 4 - Reporting and Schedule describes the expected contents of the report that will be <br /> prepared based on the results of the data collection activities. This section also presents the <br /> proposed schedule for implementation of the Work Plan; and <br /> • Section S-References lists the references cited in this Work Plan. <br /> 2 September 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.