My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1877
>
2200 - Hazardous Waste Program
>
PR0528710
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2026 11:32:06 AM
Creation date
1/28/2026 2:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0528710
PE
2220 - SM HW GEN <5 TONS/YR
FACILITY_ID
FA0018144
FACILITY_NAME
CINTAS
STREET_NUMBER
1877
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
Stockton
Zip
95206
APN
17733027
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
1877 Industrial DR Stockton 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p�w•� j <br /> ClYla f'nrrynnunn <br /> WWI"Ureanl OPrr1111nY 1''"raurr(GOP) <br /> nor hoe jO',JMM)WN'Yul <br /> N.drbnl I <br /> uAIU Orlausnrr:lul,11.IIMIti <br /> PW I S12 <br /> STARTUP PROCEDURE <br /> e followed t;It7liny 1111 nystcrn slartupn alter overnight or weekend shuts ownh: <br /> 7 he following procedure is to b <br /> I. Opcn all pun)p discharge valves that are typlCally closed atSlIl111lUWn(1)AI'/ASI I Iced Nc chemical pumps). <br /> 2. Turn all chemical pumps to AUTO at control panel or PI,('. Adjust pump Noting to proper dosagcS. <br /> 3, Set OAF/ASII feed pump flow rate in PLC(ifapplicablc)and turn pump to AUTO(control panel or P1.,C). <br /> 4. Turn the sludge transfer pump to AUTO position at control panel or N.C. <br /> I <br /> 5, Check calibration flow rate for all chemical feed pumps(drawdown tests per chemical vendor SOPS). <br /> 6. Purge bottom sludge from DAF/ASII approximately 30 minutes after startup. <br /> SHUTDOWN PROCEDURE <br /> For some systems,at a preset low-level in the equalization tank, DAl/ASII Iced and chemical pumps turn OFF <br /> automatically (normal shutdown). These pumps can also be turned OFF manually for overnight/weekend <br /> shutdown per the following procedure: <br /> I. Check water level in equalization tank(should be at low level setpoint for shutdown). <br /> 2. Turn the DAF/ASH feed and all chemical pumps to OFF at control panel or PLC. <br /> 3. Turn the equalization tank mixing system OFF at control panel or PLC. (can be left ON if needed). <br /> 4. Turn chemical mix tank mixers OFF at control panel or PLC. <br /> 5. No sooner than 30 minutes after shutdown,turn OFF recirculation pump (DAF only), solids skimmer, and <br /> sludge transfer pump to OFF at control panel or PLC.LEAVE THESE ON AUTO DIMING SHORT PERIODS <br /> OF DAF/A.SH.SffUTDOWN/<4 HRS) THROUGHOUT THE,PROC'ESSINC DPI Y. <br /> 6. Close DAF/ASH feed pump and all chemical metering pump discharge valves. <br /> 7. Purge bottom sludge from DAF/ASH after both normal and overnight shutdowns. <br /> ANYSOLID.S LEFT IN THE SYSTEM WILL CAUSE HEAVY CARRYOVER FOR UP TO INR AFTER STARTUP!! <br /> WEEKLY SHUTDOWN PROCEDURE <br /> The following procedure is to be followed when the system is to be shut down over a weekend: <br /> 1. Drain the DAF/ASH and pipe flocculator weekly and wash out all solids. If possible, drain water to the <br /> clean pit and pump solids to the sludge tank. <br />
The URL can be used to link to this page
Your browser does not support the video tag.