My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2026 3:42:08 PM
Creation date
2/3/2026 8:54:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231487
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Escalon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1329 ESCALON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN aOAQUIN Environmental Health Department <br /> COUNTY— <br /> Greatness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Pershinq Holdin s Inc. DBA Escalon Arco 11329 ESCALON AVE ESCALON FebruarV 17 2026 <br /> 18 23 CCR 16 2640(b)(1)-(9), 2641(b); HSC 6.7 25290.1(c), (d) and (e), 25290.2(c) and (d) 2061002-Type 2/3 UST mon <br /> system can detect liq/vapor from primary, has continuity, & primary product-tight <br /> OBSERVATION: Owner/Operator failed to design and/or construct a Type 2 or 3 UST system with interstitial monitoring <br /> capable of detecting liquid or vapor-phase of the hazardous substance from the primary containment and readily <br /> demonstrate continuity within a zone, and be capable of detecting water intrusion into the secondary containment, and/or <br /> failed to construct, operate, and maintain primary or secondary containment as product tight. <br /> - Interstitial fluid and rainwater were found in the 91 fill sump indicating a leak in the secondary containment. <br /> - Continuity of the interstitial fluid could not be determined in all UDC and vent sumps. Two ports were found in each <br /> sump. A change in fluid level from one port did not affect a change in level for the other port. <br /> CORRECTIVE ACTION: UST system must be modified or repaired to provide interstitial monitoring capable of detecting <br /> liquid or vapor-phase of the hazardous substance from the primary containment and readily demonstrate continuity within <br /> a zone and be capable of detecting water intrusion into the secondary containment, and ensure system is constructed, <br /> operated, and maintained so that primary and secondary containment are product-tight. Submit plans for correction to <br /> UPA for review and approval. <br /> This is a Repeat (Class 2)Violation. <br /> 31 23 CCR 16 2613(c)(4), 2633, 2640(f), 2660(c) and (e), 2665 2031002 - Overfill prevention system meets overfill <br /> requirements, tested as required, records kept (TCR 9b) <br /> OBSERVATION: Overfill prevention testing was last performed on 7/19/2021 and was completed on 12/13/2024, 5 <br /> months past due. The next due date is 7/31/2027. <br /> CORRECTIVE ACTION: Ensure testing is performed in a timely manner. <br /> This is a Repeat (Class 2)Violation. <br /> 34 23 CCR 16 2631(a), (f)-a) 2031017 - DO inspections completed at least every 30 days and meet all requirements (TCR <br /> 12) <br /> OBSERVATION: Facility did not comply with one or more of the following DO inspection requirements: Conduct the DO <br /> visual inspection at least once every 30 days; Check that all testing and maintenance has been completed and <br /> documented. <br /> -The designated operator inspections for the following months were performed more than 30 days after the previous <br /> inspection: initial inspection performed on 5/23/25 and next inspection performed on 6/24/25, initial inspection performed <br /> on 9/20/25 and next inspection performed on 10/24/25. <br /> -The 2026 reports listed the next Overfill Prevention Equipment due date as 10/1/2027. The correct date is 7/31/2027. <br /> CORRECTIVE ACTION: Ensure that facility is complying with all DO inspection requirements noted above. <br /> This is a Repeat (Class 2)Violation. <br /> 40 23 CCR 16 2613(e) 2011002 - Installation, repair, lining, integrity, calibration, and release records maintained for life of <br /> UST <br /> OBSERVATION: Records of installation, repairs, linings, integrity certification, tank calibration charts, and/or <br /> unauthorized release reports were not kept onsite, or offsite if approved by the UPA, for the life of the UST. <br /> -The following were not available for review at the time of inspection: installation test results and manufacturer checklists <br /> and manuals. <br /> CORRECTIVE ACTION: Immediately locate and maintain these records onsite and submit copies to the UPA within 30 <br /> days. <br /> This is a (Minor)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 4 of 5 FA0000293 PR0231487 4613732 2/18/2026 <br /> CP26-U aST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.