Laserfiche WebLink
Item Comments <br /> 3.3 Liquid level Task Status <br /> equipment a. Both visual and � es i iNo' ! �N/A <br /> mechanical devices <br /> must be inspected <br /> for physical damage. <br /> b. Check that the Wes ❑No' N/A <br /> device is easily <br /> 3.4 Ovll readable <br /> erfi <br /> a. If equipped with a es❑No` ❑N/A <br /> equipment "test' button, <br /> activate the audible <br /> horn or light to <br /> confirm operation. <br /> This could be battery <br /> powered. Replace <br /> the battery if needed <br /> b. If overfill valve is ❑Yes o* i !N/A <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate <br /> the mechanism to <br /> confirm operation. <br /> 3.5 Piping Check for leaks, ❑Yes" V o <br /> connections corrosion and <br /> dama e <br /> 4.0 Tank Attachments and Appurtenances <br /> 4.1 Ladder and Secure with no sign es ❑No` ❑N/A <br /> platform of severe corrosion <br /> structure or damage? <br /> 5.0 Other Conditions <br /> 5.1 Are there other conditions that should -iYes` i No <br /> be addressed for continued safe <br /> operation or that may affect the site spiil <br /> prevention Ian? <br /> Additional Comments: <br /> AST INSPECTION STANDARD <br /> 2 SEPTEMBER 2011 <br />