My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
1900 - Hazardous Materials Program
>
PR0514875
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 10:03:13 AM
Creation date
2/11/2026 9:59:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0514875
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0010850
FACILITY_NAME
M&R CO
STREET_NUMBER
505
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04702055
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
505 S MAIN ST LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Materials Business Plan Program Inspection Report <br />Date: <br />February 3, 2026 <br />Facility Address: <br />505 S MAIN ST, LODIM&R CO <br />Facility Name: <br />Environmental Health Department <br />Inspector Phone: <br />(209) 953-6212 <br />Inspector: <br />Haza Saeed, Lead Senior REHS <br />Date: 2/3/2026 <br />Printed Name and Title: <br />Jessica Costigliolo, Chief Operating <br />Officer <br />Received by: <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br />FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Overall Inspection Comments <br />Conducted a Hazardous Materials Business Plan inspection on 02/03/2026. Three violations were observed during <br />the inspection. <br />An inspection checklist was provided to the facility operator on the 02/03/2026. A complete report was finished on <br />02/10/2026 and replaces the initial checklist. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting paperwork, <br />within 30 days of receiving the complete inspection report by March 12, 2026. <br />Notes: <br />- The export shed windsock has deteriorated. <br />- The export machinery room has battle mats that are collecting oil and water. The source of the leak is unknown. <br />- Facility has three 304 cubic feet and one 205 cubic feet of compress Nitrogen cylinders. According to the <br />Maintenance Manager, Juan Carillo, two of the three 304 cubic feet cylinders have been empty, and the facility only <br />uses one cylinder. Facility is not intending to have more than three full cylinders onsite or have 1,000 cubic feet or <br />more/ HMBP reportable quantity. Ensure the empty cylinders are managed properly. A link to DTSC "Management of <br />Compressed Gas Cylinders" is provided below. If the facility total quantity of Nitrogen reaches 1,000 cubic feet or <br />more, report the chemical into CERS. <br />Violations discussed with Jessica Costigliolo on 2/03/2026. <br />The following documents/information emailed to the facility's Chief Operating Officer, Jessica Costigliolo, via <br />jessica.c@mandrpacking.net: <br />- HMBP Initial inspection checklist on 02/03/2026. <br />- Complete inspection report on 02/10/2026. <br />- Inspection Photos 02/10/2026. <br />- Link to DTSC "Management of Compressed Gas Cylinders": https://dtsc.ca.gov/management-of-compressed-gas- <br />cylinders/ <br />- Link to EHD Free CUPA Training Classes: https://nes-ehs.com/product-category/san-joaquin-classes/ <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 4 of 4EHD - CUPA Inspection Report IS03 <br />CP25 - HMBP <br />2/10/2026FA0010850 PR0514875 4604010
The URL can be used to link to this page
Your browser does not support the video tag.