My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2900 - Site Mitigation Program
>
PR0536144
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 8:48:17 AM
Creation date
2/17/2026 8:26:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536144
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0020773
FACILITY_NAME
CHARTER WAY COMMINGLED PLUME CP#57
STREET_NUMBER
508
STREET_NAME
DR MARTIN LUTHER KING JR
City
STOCKTON
Zip
95206
APN
16503010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
508 DR MARTIN LUTHER KING JR STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3 <br />Soil Boring and Well Construction Details <br />Stockton Charter Way Commingled Plume <br />440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 1 of 10 Stantec <br />TOC <br />Borehole <br />CasingBentonite <br />Seal <br />Cement Seal <br />Water - <br />Installation <br />Total Depth <br />Casing <br />Slot Size <br />Screened Interval <br />Filter Pack Interval <br />Location I.D. <br />Elevation <br />Diameter <br />Diameter <br />Interval <br />Interval <br />Bearing <br />Comments <br />Date <br />(feet bgs) <br />Material <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />feet <br />inches <br />inches <br />feet bgs) <br />feet bgs) <br />Zone <br />Former ARCO Service Station No. 2168 <br />Soil Borings (B) <br />B-1 <br />07/16/91 <br />- <br />31.5 <br />8 <br />0-31.5 <br />B-2 <br />07/16/91 <br />42.5 <br />8 <br />0-42.5 <br />B-3 <br />07/17/91 <br />21.5 <br />8 <br />0-21.5 <br />B-4 <br />07/17/91 <br />21.5 <br />8 <br />0-21.5 <br />B-5 <br />04/27/92 <br />56 <br />10 <br />- <br />see MW -1 for details <br />B-6 <br />04/28/92 <br />56 <br />10 <br />- <br />see MW -2 for details <br />B-7 <br />04/29/92 <br />41 <br />6.25 <br />0-41 <br />B-8 <br />05/05/92 <br />56 <br />10 <br />- <br />see MW -3 for details <br />B-9 <br />05/06/92 <br />41 <br />10 <br />see VW -1 for details <br />B-10 <br />05/07/92 <br />40 <br />10 <br />see VW -2 for details <br />B-11 <br />05/07/92 <br />40 <br />10 <br />- <br />see VW -3 for details <br />B-12 <br />05/06/92 <br />40 <br />8 <br />0-40 <br />B-13 <br />01/11/93 <br />41 <br />8.25 <br />- <br />see VW -4 for details <br />B-14 <br />01/11/93 <br />57 <br />10.25 <br />- <br />see MW -4 for details <br />B-15 <br />01/12/93 <br />14.5 <br />6.5 <br />0-14.5 <br />B-16 <br />01/12/93 <br />57 <br />10.25 <br />- <br />see MW -5 for details <br />B-17 <br />01/12/93 <br />26 <br />8.25 <br />see VW -5 for details <br />B-18 <br />01/13/93 <br />40 <br />8.25 <br />see VW -6 for details <br />B-19 <br />01/13/93 <br />41 <br />8.25 <br />see VW -7 for details <br />B-20 <br />10/06/93 <br />53 <br />8.25 <br />see MW -6 for details <br />B-21 <br />10/07/93 <br />50 <br />8.25 <br />see MW -7 for details <br />B-22 <br />07/24/96 <br />26 <br />10 <br />see VW -13 for details <br />B-23 <br />07/24/96 <br />26 <br />10 <br />see VW -12 for details <br />B-24 <br />07/24/96 <br />26 <br />10 <br />see VW -11 for details <br />B-25 <br />07/24/96 <br />26 <br />10 <br />- <br />see VW -10 for details <br />B-26 <br />07/10/15 <br />55 <br />6.5 <br />0-55 <br />B-27 <br />07/10/15 <br />55 <br />6.5 <br />0-55 <br />B-28 <br />07/02/15 <br />10 <br />3 <br />0-10 <br />B-29 <br />07/02/15 <br />10 <br />3 <br />0-10 <br />HA -1 <br />Proposed <br />10 <br />3 <br />0-10 <br />Proposed for LTCP Eval <br />HA -2 <br />Proposed <br />10 <br />3 <br />0-10 <br />Proposed for LTCP Eval <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 1 of 10 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.