Laserfiche WebLink
TABLE 3 <br />Soil Boring and Well Construction Details <br />Stockton Charter Way Commingled Plume <br />440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 3 of 10 Stantec <br />TOC <br />Borehole <br />Casing <br />Bentonite Seal <br />Cement Seal <br />Water - <br />Installation <br />Total Depth <br />Casing <br />Slot Size <br />Screened Interval <br />Filter Pack Interval <br />Location I.D. <br />Elevation <br />Diameter <br />Diameter <br />Interval <br />Interval <br />Bearing <br />Comments <br />Date <br />(feet bgs) <br />Material <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />(feet) <br />(inches) <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />Zone <br />Extraction Wells (EW) <br />EW -1 <br />11/03/05 <br />11.23 <br />41 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 33-39 <br />10-12, 26-33, 39-41 <br />0-10 <br />A <br />EW -2 <br />11/03/05 <br />12.07 <br />39 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 33-39 <br />10-12, 26-33 <br />0-10 <br />A <br />EW -3 <br />11/04/05 <br />11.70 <br />39 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 33-39 <br />10-12, 26-33 <br />0-10 <br />A <br />EW -4 <br />11/11/05 <br />12.07 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 29-33.5 <br />10-12, 26-29, 33.5-37 <br />0-10 <br />A <br />EW -5 <br />11/04/05 <br />12.29 <br />39 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-33.5 <br />10-12, 26-30, 33.5-39 <br />0-10 <br />A <br />EW -6 <br />11/10/05 <br />12.28 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />EW -7 <br />11/10/05 <br />11.98 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />EW -8 <br />11/08/05 <br />11.84 <br />39 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 31-36 <br />10-12, 26-31, 36-39 <br />0-10 <br />A <br />EW -9 <br />11/11/05 <br />12.16 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30.5-35 <br />10-12, 26-30.5, 35-37 <br />0-10 <br />A <br />EW -10 <br />11/14/05 <br />12.08 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 31-35 <br />10-12, 26-31, 35-37 <br />0-10 <br />A <br />EW -11 <br />11/07/05 <br />13.24 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-33.5 <br />10-12, 26-30, 33.5-37 <br />0-10 <br />A <br />EW -12 <br />11/07/05 <br />14.89 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />EW -13 <br />11/08/05 <br />14.78 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />EW -14 <br />11/09/05 <br />13.64 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 31-35.5 <br />10-12, 26-31, 35.5-37 <br />0-10 <br />A <br />EW -15 <br />11/15/05 <br />12.33 <br />37 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 31-34.5 <br />10-12, 26-31, 34.5-37 <br />0-10 <br />A <br />EW -16 <br />11/15/05 <br />12.23 <br />39 <br />10 <br />2 <br />SCH. 80 PVC <br />0.020 <br />15-25 <br />12-26, 34-39 <br />10-12, 26-34 <br />0-10 <br />A <br />EW -17 <br />11/15/05 <br />1 12.20 <br />1 41 <br />1 10 <br />1 2 <br />1 SCH. 80 PVC <br />1 0.020 <br />1 15-25 <br />1 12-26, 35-38.5 <br />10-12, 26-35, 38.5-41 <br />1 0-10 <br />1 A <br />Sparge Wells (SP) <br />SP -1 <br />11/03/05 <br />11.23 <br />41 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />36-38 <br />12-26, 33-39 <br />10-12, 26-33, 39-41 <br />0-10 <br />B <br />SP -2 <br />11/03/05 <br />12.07 <br />39 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />36-38 <br />12-26, 33-39 <br />10-12, 26-33 <br />0-10 <br />B <br />SP -3 <br />11/04/05 <br />11.70 <br />39 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />36-38 <br />12-26, 33-39 <br />10-12, 26-33 <br />0-10 <br />B <br />SP -4 <br />11/11/05 <br />12.07 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 29-33.5 <br />10-12, 26-29, 33.5-37 <br />0-10 <br />A <br />SP -5 <br />11/04/05 <br />12.29 <br />39 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-33.5 <br />10-12, 26-30, 33.5-39 <br />0-10 <br />A <br />SP -6 <br />11/10/05 <br />12.28 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />SP -7 <br />11/10/05 <br />11.98 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />SP -8 <br />11/08/05 <br />11.84 <br />39 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />33-35 <br />12-26, 31-36 <br />10-12, 26-31, 36-39 <br />0-10 <br />A <br />SP -9 <br />11/11/05 <br />12.16 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32.5-34.5 <br />12-26, 30.5-35 <br />10-12, 26-30.5, 35-37 <br />0-10 <br />A <br />SP -10 <br />11/14/05 <br />12.08 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32-34 <br />12-26, 31-35 <br />10-12, 26-31, 35-37 <br />0-10 <br />A <br />SP -11 <br />11/07/05 <br />13.24 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-33.5 <br />10-12, 26-30, 33.5-37 <br />0-10 <br />A <br />SP -12 <br />11/07/05 <br />14.89 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />SP -13 <br />11/08/05 <br />14.78 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />12-26, 30-34 <br />10-12, 26-30, 34-37 <br />0-10 <br />A <br />SP -14 <br />11/09/05 <br />13.64 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />33-35 <br />12-26, 31-35.5 <br />10-12, 26-31, 35.5-37 <br />0-10 <br />B <br />SP -15 <br />11/15/05 <br />12.33 <br />37 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32-34 <br />12-26, 31-34.5 <br />10-12, 26-31, 34.5-37 <br />0-10 <br />A <br />SP -16 <br />11/15/05 <br />12.23 <br />39 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />36-38 <br />12-26, 34-39 <br />10-12, 26-34 <br />0-10 <br />A <br />SP -17 <br />11/15/05 <br />12.20 <br />41 <br />10 <br />1 <br />SCH. 80 PVC <br />0.020 <br />36-38 <br />12-26, 35-38.5 <br />10-12, 26-35, 38.5-41 <br />0-10 <br />A <br />SP -18 <br />11/10/05 <br />12.27 <br />37 <br />8 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32-34 <br />30-34.5 <br />27-30, 34.5-37 <br />0-27 <br />A <br />SP -19 <br />11/04/05 <br />12.93 <br />37 <br />8 <br />1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />30-33.5 <br />26-30, 33.5-37 <br />0-26 <br />A <br />SP -20 <br />11/09/05 <br />13.71 <br />37 <br />8 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32-34 <br />30-35 <br />27-30, 35-37 <br />0-27 <br />A&B <br />SP -21 <br />11/14/05 <br />14.24 <br />37 <br />8 <br />1 <br />SCH. 80 PVC <br />0.020 <br />32-34 <br />31-34.5 <br />26-31, 34.5-37 <br />0-26 <br />A <br />SP -22 <br />11/11/05 <br />-- <br />1 37 <br />1 8 <br />1 1 <br />SCH. 80 PVC <br />0.020 <br />31-33 <br />1 29-33.5 <br />1 26-29, 33.5-37 <br />1 0-26 <br />1 A <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 3 of 10 Stantec <br />