My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2900 - Site Mitigation Program
>
PR0536144
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 8:48:17 AM
Creation date
2/17/2026 8:26:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536144
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0020773
FACILITY_NAME
CHARTER WAY COMMINGLED PLUME CP#57
STREET_NUMBER
508
STREET_NAME
DR MARTIN LUTHER KING JR
City
STOCKTON
Zip
95206
APN
16503010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
508 DR MARTIN LUTHER KING JR STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3 <br />Soil Boring and Well Construction Details <br />Stockton Charter Way Commingled Plume <br />440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 9 of 10 Stantec <br />TOC <br />Borehole <br />Casing <br />Bentonite Seal <br />Cement Seal <br />Water - <br />Installation <br />Total Depth <br />Casing <br />Slot Size <br />Screened Interval <br />Filter Pack Interval <br />Location I.D. <br />Elevation <br />Diameter <br />Diameter <br />Interval <br />Interval <br />Bearing <br />Comments <br />Date <br />(feet bgs) <br />Material <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />(feet) <br />(inches) <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />Zone <br />SMW-22-80 <br />10/26/07 <br />11.94 <br />81 <br />8 <br />2 <br />SCH. 40 PVC <br />0.010 <br />70-80 <br />68-81 <br />65-68 <br />0-65 <br />C <br />SMW-23 <br />10/24/07 <br />11.03 <br />50 <br />6 <br />2 <br />SCH. 40 PVC <br />0.010 <br />15-30 <br />13-30, 33-50 <br />10-13, 30-33 <br />0-10 <br />A <br />SMW-24A <br />06/01/15 <br />12.40 <br />30 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />10.5-26 <br />8-26 <br />6-8; 26-30 <br />0-6 <br />A <br />SMW-24B <br />06/03/15 <br />12.50 <br />55.5 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />45-55.5 <br />42-55.5 <br />40-42 <br />0-40 <br />B <br />SMW-25A <br />06/22/15 <br />12.13 <br />28 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />12-27 <br />11-28 <br />8-11 <br />0-8 <br />A <br />SMW-25B <br />06/19/15 <br />12.09 <br />56.5 <br />10 <br />2 <br />SCH. 40 PVC <br />0.010 <br />45.5-55.5 <br />44-56.5 <br />40-44 <br />0-40 <br />B <br />SMW-26A <br />06/23/15 <br />11.43 <br />28 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />12-27 <br />10-28 <br />8-10 <br />0-8 <br />A <br />SMW-26B <br />06/16/15 <br />11.42 <br />51 <br />10 <br />2 <br />SCH. 40 PVC <br />0.010 <br />45-50 <br />44-51 <br />41-44 <br />0-41 <br />B <br />SMW-27C <br />06/26/15 <br />13.76 <br />85.5 <br />6.5 <br />2 <br />SCH. 40 PVC <br />0.010 <br />70-85 <br />73-85.5 <br />70-73 <br />0-70 <br />C <br />SMW-27D <br />06/23/15 <br />13.83 <br />120 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />99.5-110 <br />98-111 <br />96-98; 111-120 <br />0-96 <br />D <br />SMW-28C <br />06/30/15 <br />11.86 <br />80 <br />6.5 <br />2 <br />SCH. 40 PVC <br />0.010 <br />69-79.5 <br />66.5-79.5 <br />64.5-66.5 <br />0-64.5 <br />C <br />SMW-28D <br />07/02/15 <br />13.04 <br />125.5 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />115-125.5 <br />113-125.5 <br />110.5-113 <br />0-110.5 <br />D <br />SMW-29C <br />06/19/15 <br />10.73 <br />80 <br />6.5 <br />2 <br />SCH. 40 PVC <br />0.010 <br />70-80 <br />68-80 <br />66-68 <br />0-66 <br />C <br />SMW-29D <br />06/17/15 <br />10.82 <br />120 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />105-115 <br />103-117 <br />101-103; 117-120 <br />0-101 <br />D <br />SMW-30A <br />05/29/15 <br />12.74 <br />29.5 <br />8.25 <br />4 <br />SCH. 40 PVC <br />0.010 <br />14.5-29.5 <br />13-29.5 <br />11-13 <br />1-11 <br />A <br />SMW-31B <br />02/15/17 <br />12.35 <br />58 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />48-58 <br />47-58 <br />45-47 <br />1-45 <br />B <br />SMW-32B <br />02/03/17 <br />11.82 <br />50 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />45-50 <br />43-50 <br />41-43 <br />1-43 <br />B <br />SMW-33B <br />02/01/17 <br />12.68 <br />55 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />45-55 <br />43-55 <br />41-43 <br />1-41 <br />B <br />SMW-34D <br />Pending <br />120 (est.) <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />100-120 (est.) <br />98-120 <br />96-98 <br />1-96 <br />D <br />Estimated Depths <br />SMW-34E <br />Pending <br />150 (est.) <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />130-150 (est.) <br />128-150 <br />126-128 <br />1-126 <br />E <br />Estimated Depths <br />SMW-35D <br />02/07/17 <br />13.57 <br />118 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />103-118 <br />101-118 <br />99-101 <br />1-99 <br />D <br />SMW-35E <br />02/10/17 <br />13.33 <br />149.5 <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />137-149.5 <br />136-149.5 <br />134-136 <br />1-134 <br />E <br />SMW-36E <br />Pending <br />150 (est.) <br />10 <br />4 <br />SCH. 40 PVC <br />0.010 <br />130-150 (est.) <br />1 128-150 <br />1 126-128 <br />1 1-126 <br />1 E <br />Estimated Depths <br />Vapor Extraction Wells (SVEW) <br />SVEWAS <br />04/28/92 <br />11.40 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />13.5-23.5 <br />12.5-24 <br />11-12.5 <br />0-11 <br />A <br />Nested well <br />SVEW-1 D <br />04/28/92 <br />11.40 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />30.5-40.5 <br />28-41.5 <br />24-28 <br />0-11 <br />B <br />Nested well <br />SVEW-2S <br />04/27/92 <br />11.69 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />15-25 <br />14-26.5 <br />12.5-14 <br />0-12.5 <br />A <br />Nested well <br />SVEW-2D <br />04/27/92 <br />11.70 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />30.5-40.5 <br />29.5-41.5 <br />26.5-29.5 <br />0-12.5 <br />B <br />Nested well <br />SVEW-3S <br />04/28/92 <br />11.68 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />15-25 <br />14-25 <br />12.5-14 <br />0-12.5 <br />A <br />Nested well <br />SVEW-3D <br />04/28/92 <br />11.75 <br />41.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />30.5-40.5 <br />28.5-41.5 <br />25-28.5 <br />0-12.5 <br />B <br />Nested well <br />SVEW-4S <br />04/27/92 <br />11.79 <br />40.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />15-25 <br />14-26 <br />12.5-14 <br />0-12.5 <br />A <br />Nested well <br />SVEW-4D <br />04/27/92 <br />1 11.81 <br />1 40.5 <br />12 <br />4 <br />SCH. 40 PVC <br />0.020 <br />30.5-40.5 <br />29.5-40.5 <br />1 26-29.5 <br />1 0-12.5 <br />1 A <br />Nested well <br />ART Technology Wells <br />ARTA <br />02/09/17 <br />12.66 <br />80 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />11.5-16.5 & 60-80 <br />9.5-17.5 & 59-80 <br />7.5-9.5 & 57-59 <br />1-7.5 & 17.5-57 <br />C <br />Top screen in A <br />ART -2 <br />02/24/17 <br />12.14 <br />67 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />5-12 & 47-67 <br />4-12 & 45-67 <br />3-4 & 43-45 <br />1-3 & 12-43 <br />C <br />Top screen in A <br />ART -3 <br />03/01/17 <br />11.94 <br />78 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />9-14 & 58-78 <br />8-15 & 56-78 <br />7-8 & 54-56 <br />1-7 & 15-54 <br />C <br />Top screen in A <br />ART -4 <br />03/21/17 <br />11.64 <br />118.5 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />5-12.5 & 97.5-118.5 <br />4-12.5 & 96.5-118.5 <br />3-4 & 94.5-96.5 <br />1-3 & 12.5-94.5 <br />D <br />Top screen in A <br />ART -5 <br />02/17/17 <br />11.68 <br />108 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />5-15 & 98-108 <br />3-15 & 96-108 <br />2-3 & 93.5-96 <br />1-2 &15-93.5 <br />D <br />Top screen in A <br />ART -6 <br />02/03/17 <br />11.18 <br />118 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />4-14 & 98-118 <br />3-16 & 96-118 <br />2-3 & 94-96 <br />1-2 & 16-94 <br />D <br />Top screen in A <br />ART -7 <br />03/24/17 <br />11.39 <br />65 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />8-13 & 40-65 <br />7-13 & 38-65 <br />6-7 & 36-38 <br />1-6 & 13-36 <br />B <br />Top screen in A <br />ART -8 <br />02/22/17 <br />12.39 <br />65 <br />12 <br />6 <br />SCH. 40 PVC <br />0.020 & 0.010 <br />3-8 & 50-65 <br />2-8 & 48-65 <br />1-2 & 46-48 <br />0.5-1 & 8-46 <br />B <br />Top screen in A <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 9 of 10 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.